Hey guys i know this has probably been asked before but couldnt really find anything

i am building a rb25/30 and am currently looking at a set of forgies to suit a rb30et with an advertised compression ratio of 8.5-1 when used with single cam head.

will this bring my compression down to about 8.2-1 with the rb25det head?

here is some specs on the pistons

Piston Type Forged Ring Set Part # C1686 Compression Height 32mm/1.261in Sizes Available: STD, 050, 1.00 Piston Crown Capacity 4.5cc bs150gtr_ecblank.gifRing 1 Ring 2 Ring 3 Dish Type Steel Nitrided

Barrel plain

Reverse torsional taper face scraper Duraflex 3 piece oil ring Bowl Depth 0mm/in Width 1.5mm/0.059in 1.5mm/0.059in 2.8mm/0..11in Compression Ratio 8.5 Depth 3.4mm/0.133in 3.8mm/0.149in 3.9mm/0.153in Piston Mass 322 grams (0.50) bs150gtr_ecblank.gif1.gif

2.gif

3.gif

Pin Mass 84 grams Pin Diameter 21mm/0.827in Pin Locking Device

Spiral Lock Clearance 0.12mm/.005in Skirt Coated No

Link to comment
https://www.sau.com.au/forums/topic/338966-rb2530/
Share on other sites

  • 2 weeks later...

I work in a machine shop and I've done alot of measurements with my rb30/26;

using JE +0.040" (+1mm) pistons (rb26 10cc domed piston with rb30 piston pin offset) the piston still sat 0.030" (0.76mm) down the bore

you will most likely still need to grind both the block and the deck to get a reasonable compression ratio

Below is the formula (the numbers used are my measurements as an example)

Bore x Stroke

bore x bore ÷ 4 =

87 x 87 ÷ 4 = 1892.25

Answer x stroke x π (pie) =

1892.25 x 85 x 3.142 = 505363.2075

answer ÷ 1000 =

505363.2075 ÷ 1000 = 505.363208 = SV

answer x number of cylinders = cc

cc ÷ 1000 = litre

Head Gasket

Same formula as above though this part is quite often left out

gasket bore squared ÷ 4

87.3 x 87.3 ÷ 4 =1905.3225

answer x gasket thickness x π (pie) ÷ 1000

1905.3225 x 1.4 x 3.142 = 8381.132613

8381.132613 ÷ 1000 = 8.381133 [ + ]

Head Chamber CC

Using a burette cc the head, when I ground my rb26 head I ground off 0.010" which took out 1cc, and same when I took another 0.010". But after grinding another 0.040" It had taken another 6.4cc's out. in total I ground 0.080" off the head and it took out 12cc's

Piston Dome/Dish /dome with valve releifs

They can vary a lot, most piston manufacturers will say what cc they have

mine say 10cc (Dome [ - ]) (Dish [ + ])

Deck height

This is the measurement from the deck to the top of the piston (not top on the dome) when the piston is at TDC

If the piston is below the deck (0.3mm is an example as mine is 0)

bore x bore ÷ 4 =

87 x 87 ÷ 4 = 1892.25

= x deck to piston x pie ÷ 1000

1892.25 x 0.3 x 3.142 =1783.63485

1783.63485 ÷ 1000 = 1.783635 [ + ]

0 Deck height is 0

Piston above the deck (0.017"/0.43mm for this set up)

top measurement of the piston squared ÷ 4

86 x 86 ÷ 4 = 1849

= x piston to deck x pie ÷ 1000

1849 x 0.4 x 3.142 = 2498.10994

2498.10994 ÷ 1000 = 2.49811 [ - ]

Adding it all together

Head CC + Gasket volume

then the following options

+ Piston Dish

+ Piston below deck

- Piston Dome

- Piston above deck

for me

Head cc + Gasket - Piston Dome - Piston above deck = CV

54.4 + 8.381133 - 10 0 = 52.781133

CV + SV =

52.781133 + 505.363208 = 558.144341

Answer ÷ CV = Compression ratio

558.144341 ÷ 52.781133 = 10.574694

=

10.57:1

Link to comment
https://www.sau.com.au/forums/topic/338966-rb2530/#findComment-5500595
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • Hi, is the HKS  Tower Bar still available ? negotiable ? 🤔
    • From there, it is really just test and assemble. Plug the adapter cables from the unit into the back of the screen, then the other side to the car harness. Don't forget all the other plugs too! Run the cables behind the unit and screw it back into place (4 screws) and you should now have 3 cables to run from the top screen to the android unit. I ran them along the DS of the other AV units in the gap between their backets and the console, and used some corrugated tubing on the sharp edges of the bracket so the wires were safe. Plug the centre console and lower screen in temporarily and turn the car to ACC, the AV should fire up as normal. Hold the back button for 3 sec and Android should appear on the top screen. You need to set the input to Aux for audio (more on that later). I put the unit under the AC duct in the centre console, with the wifi antenna on top of the AC duct near the shifter, the bluetooth antenna on the AC duct under the centre console The GPS unit on top of the DS to AC duct; they all seem to work OK there are are out of the way. Neat cable routing is a pain. For the drive recorder I mounted it near the rear view mirror and run the cable in the headlining, across the a pillar and then down the inside of the a pillar seal to the DS lower dash. From there it goes across and to one USB input for the unit. The second USB input is attached to the ECUtec OBD dongle and the 3rd goes to the USB bulkhead connected I added in the centre console. This is how the centre console looks "tidied" up Note I didn't install the provided speaker, didn't use the 2.5mm IPod in line or the piggyback loom for the Ipod or change any DIP switches; they seem to only be required if you need to use the Ipod input rather than the AUX input. That's it, install done, I'll follow up with a separate post on how the unit works, but in summary it retains all factory functions and inputs (so I still use my phone to the car for calls), reverse still works like factory etc.
    • Place the new daughterboard in the case and mount it using the 3 small black rivets provided, and reconnect the 3 factory ribbon cables to the new board Then, use the 3 piggyback cables from the daughterboard into the factory board on top (there are stand offs in the case to keep them apart. and remember to reconnect the antenna and rear cover fan wires. 1 screw to hold the motherboard in place. Before closing the case, make a hole in the sticker covering a hole in the case and run the cable for the android unit into the plug there. The video forgot this step, so did I, so will you probably. Then redo the 4 screws on back, 2 each top and bottom, 3 each side and put the 2 brackets back on.....all ready to go and not that tricky really.      
    • Onto the android unit. You need to remove the top screen because there is a daughterboard to put inside the case. Each side vent pops out from clips; start at the bottom and carefully remove upwards (use a trim remover tool to avoid breaking anything). Then the lower screen and controls come out, 4 screws, a couple of clips (including 3 flimsy ones at the top) and 3 plugs on the rear. Then the upper screen, 4 screws and a bunch of plugs and she is out. From there, remove the mounting brackets (2 screws each), 4 screws on the rear, 2 screws top and bottom and 3 screws holding in the small plates on each side. When you remove the back cover (tight fit), watch out for the power cable for the fan, I removed it so I could put the back aside. The mainboard is held in by 1 screw in the middle, 1 aerial at the top and 3 ribbon cables. If you've ever done any laptop stuff the ribbon cables are OK to work with, just pop up the retainer and they slide out. If you are not familiar just grab a 12 year old from an iphone factory, they will know how it works The case should now look like this:
    • Switching the console was tricky. First there were 6 screws to remove, and also the little adapter loom and its screws had to come out. Also don't forget to remove the 2 screws holding the central locking receiver. Then there are 4 clips on either side....these were very tight in this case and needed careful persuading with a long flat screw driver....some force required but not enough to break them...this was probably the fiddliest part of the whole job. In my case I needed both the wiring loom and the central locking receiver module to swap across to the new one. That was it for the console, so "assembly is the reverse of disassembly"
×
×
  • Create New...