hey there boys and girls

i am looking around for the best deal i can get with a big shed

size i am after is 9x11 and height of 4m and to have concrete poured into the shed instead of a slab and to be 200mm thick to be able to fit a hoist

at the moment i have been contacting a couple place and soo far i have been qouted 28k to 32k and the concret cost was about 7-9k that was already included in the qoute

anyone out there know of any good place i should check out??

thanks

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/
Share on other sites

The whole slab does not have to be 200mm.

(in fact my slab is ~100mm and I have a hoist). Most hoist manufacturers offer extended footprints (spread the load) on their posts to allow for skinnier slabs :)

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7529401
Share on other sites

The big metal plate in the pic is an option, however other options are the big metal plate (not as big) actually manufactured as the base plate for the hoist. ie no need for attachment, it is the base.

Contact Gav or Maree at HAPP and ask anything you need to know about installing/specs/slab requirements. Tell em Mike sent you and they will sort you out.

Edited by MagicMikeZ32
Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7529420
Share on other sites

That's about right for a shed of that size. My 9x6.5x3.6 was 15k for just the kit, then 6k for concrete (I only did half pad at 200mm for my hoist), then I installed it which was a pain in itself

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7531820
Share on other sites

Bit of advice, pay someone to do it. A shit tonnes easier, it gets done right the first time and properly, and all those people that offer to help but not show up on the day and it takes you 5 weeks to put it up (may have happened to me)

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7533250
Share on other sites

yeahh i was dreading the idea it would take a lot longer if i was going to do it and stuff up.

thanks for the for giving me the idea in only having half the slab 200mm i may do the same just have the area i will have the hoist 200mm

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7533912
Share on other sites

  • 2 months later...

alright, shed has gone through council and i will be putting the slab down in a couple of weeks, as this is on a vacant block (not building a house yet) anyone have an idea on how much it would cost to get power hooked up? and any tips on wiring for the shed?

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7567739
Share on other sites

Get a couple of quotes for wiring, offer the sparky to dig the trench and lay cable down. Also offer to TA for them, pre-run the cable in the shed, anything to make their time at yours less.

Get at least 2x 15amp power points put in just in case you want to get a welder and some hoists run 15amp. Get double fluros for light, I have 2x in each bay lights up like a mofo. I also have 6x double 10amp points, 2x 15amp 1 of which is hanging from the ceiling

I did all the pre-wiring and trench digging for my sparky made it a lot less painful on the bill

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7570957
Share on other sites

pretty much similar to what i was thinking,

and what you mean by pre-wiring is that you have all wiring laid out to where you would have it and the sparky just connects everything, am i right???

how did you run the cables into the shed, i was thinking of something like having some conduit through my slab then underground

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7571417
Share on other sites

Yeah run all the wiring to where you want everything, then the sparky comes and finishes it off.

I ran them from my house fuse box all the way down to the shed, ran the cable through the orange conduit 600mm underground. It now runs under concrete. Was quite a bit of digging but it saved me a lot

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7575756
Share on other sites

Just a word of warning. That steel base plate does very little to spread the load. It will be effective for the first 20mm past the standard foot plate (if you're lucky) then the rest is there purely for show. If you want a proper base plate, it needs to be gusseted to properly transfer the loads to the edges, or be much thicker than what's shown in the photo

As for tips on wiring the shed - LOTS of power points (including at least one 15A point). Also LOTS of overhead lighting. You don't need to use it all, but it's infinitely better than having power boards and extension leads all through the shed.

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7578543
Share on other sites

  • 1 month later...

Bunnings stuff last me a year before having to recoat. That was a year of heavy traffic though as I was working in there everyday.

The more industrial stuff lasts a bit longer but it also costs more

Link to comment
https://www.sau.com.au/forums/topic/456408-shed-builders/#findComment-7611303
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • It would be different if the sealant hadn't started to peel up with gaps in the glue about ~6cm and bigger in some areas. I would much prefer not having to do the work take them off the car . However, the filler the owner put in the roof rack mount cavities has shrunk and begun to crack on the rail delete panels. I cant trust that to hold off moisture ingress especially where I live. Not only that but I have faded paint on as well as on either side of these panels, so they would need to come off to give the roofline a proper respray. My goal is to get in there and put a healthy amount of epoxy instead of panel filler/bog and potentially skin with carbon fiber. I have 2 spare rolls from an old motorcycle fairing project from a few years back and I think it'd be a nice touch on a black stag.  I've seen some threads where people replace their roof rack delete with a welded in sheet metal part. But has anyone re-worked the roof rails themselves? It seems like there is a lot of volume there to add in some threads and maybe a keyway for a quick(er) release roof rack system. Not afraid to mill something out if I have to. It would be cool to have a cross bar only setup. That way I can keep the sleek roofline that would accept a couple bolts to gain back that extra utility  3D print some snazzy covers to hide the threaded section to be thorough and keep things covered when not using the rack. 
    • Probably not. A workshop grade scantool is my go to for proper Consult interrogation. Any workshop grade tool should do it. Just go to a workshop.
    • In my head it does make sense to be a fuel problem since that is what I touched when cleaning the system. When I was testing with the fuel pressure gauge, the pressure was constantly 2.5 bar with the FPR vacuum removed. When stalling, the pressure was going up to 3.0 bar (which is how it should be on ignition).
    • ECUtalk pages don't mention they support the ABS computer (consult port has more than one CAN), so you might just need a different scan tool. But, I would expect ABS is a different light to the brake warning/handbrake light, do you see an ABS light come on for a few seconds when you turn the key from ACC to IGN? But since you said: I'd have a look at the ABS sensors in the rear hubs to make sure they are not damaged, disconnected etc.
    • OK, if it idles at 1000+ with the AAC, its not an idle airflow problem. The cold start valve just gives extra air when the engine is cold, but you have enough air without it to idle at 1000. I think you are back to a fuel problem, sorry. Can you see the fuel pressure staying constant or does it drop as the revs drop to a stall?  
×
×
  • Create New...