Jump to content
SAU Community

Recommended Posts

yes thats the delimer im in, all cash has been thrown at home loan. preventing me from buying another car.

i need to be sensible :) there's only 1 carport at my house and thats got GTR written all over it.

its justafiable a normal person needs 3 cars right? 1 for when it rains 1 to drive to work when it dosnt rain and 1 for weekend trips :D

Edited by Inline 6

i cant get another project until i get a shed up...my mate has a datto 1200 he wont sell me until i get a shed.....now i just need my "minister of finances" to let me do it....my brother in law is a sparky , so wiring wont be a problem...i helped concrete my uncles burnout pad...so concreting wont be a problem....gotta save money everywhere....this week i have to fix a leak on my eldest's motorbike as well....it never ends

Does anyone know any cheap companies that do...

Fencing

Driveways/Concrete or Pavers

House perimiter concrete or pavers

Flooring (Tiles/Carpets etc)

I can do it through my builder but he said its cheaper not to....

do the paving and carpeting yaself is 1 option :D

That was a joke yeah?

I dont see that working out haha

I cant get the loan until I have quotes for that stuff... well thats if I get pre approved... they havn't got back to me yet...

i got my loan without qoutes for it, hmmmzzz although i had a huge deposit they prob didnt care so much cause they gonna get their cash back no matter what.

pavings not that hard i hear, you may break a nail or 2 though :D

I dont have any nails to break at the moment!

I dunno why... its a Homestart condition.

I can always get quotes and not use them, do it myself over time... if they dont check.

I dont have any nails to break at the moment!

I dunno why... its a Homestart condition.

I can always get quotes and not use them, do it myself over time... if they dont check.

I think a place like Homestart would only instruct the bank to release the funds to the company/tradesperson carrying out the work.

Penny, go to the Home Centre corner of Anzac Hwy and South Road if you can, and get some ideas on who to employ for those jobs. Even the centres that sell the materials (paving etc) will have contractors they can get to do the work. And it should be cheaper than the builder (Homestart) getting it done for you.

I'm in the middle of building my own extension. Doing all the work (99.9%) of it myself and its not easy. Paving would be a breeze in comparison. But I study construction management, so I gotta know this shit. :(

Even better for you ... stand out the front of my TAFE college and look pretty and sucker some of the studying tradies to do the work for you :D

The Design and Construction Management course has two sides: the designers/drafters (like me) and the builders (them), and we like to give them crap :D

Edited by RubyRS4

I can lend you 1 of my skirts if you need penny rofl warning may look like a tshirt but i assure u its a skirt.

might be cause yeah i amended it after i got approval, or might be the builders and lenders im through know im friends with their biggest client :D

Edited by Inline 6
I think a place like Homestart would only instruct the bank to release the funds to the company/tradesperson carrying out the work.

Penny, go to the Home Centre corner of Anzac Hwy and South Road if you can, and get some ideas on who to employ for those jobs. Even the centres that sell the materials (paving etc) will have contractors they can get to do the work. And it should be cheaper than the builder (Homestart) getting it done for you.

I'm in the middle of building my own extension. Doing all the work (99.9%) of it myself and its not easy. Paving would be a breeze in comparison. But I study construction management, so I gotta know this shit. :P

Even better for you ... stand out the front of my TAFE college and look pretty and sucker some of the studying tradies to do the work for you :D

The Design and Construction Management course has two sides: the designers/drafters (like me) and the builders (them), and we like to give them crap :(

Haha well that could work!! Where is your TAFE? Lol

I'll have to get to that Home Centre and have a look this weekend I think.

I have emailed a few places for rough quotes, one of them was more expensive then the builder!

Lucky you being able to do it all yourself, I struggled making the barbie fold and fun house. :D

I could probably build a dog kennel. Thats about it. Mind you I have never tried...

so whats the mates rates ruby :(

To design you a building in accordance with all Australian Standards and Council codes ... I wouldn't even hazard a guess for a fixed fee ... but generally $60 per hour is the norm and there are ALOT of hours involved. And thats just the designing stage.

I'm amending the drawings to my house extension every week or so. Its not as simple as drawing the house you want.

Lesson in one storey building design, so listen up ... :D

The building must be designed for the use of standard brickwork, so the dimensions of the house are determined by the brick course. Openings for windows and doors etc must also meet design consideration of brickwork. There are set dimensions for wall construction and cavities. Cut and fill for the buidling footprint on the site. AS for timber type and strength for roof loads. Council design techniques to be considered for energy efficient homes. Consideration of open space and floor area ratios. Overlooking and overshadowing issues. And so on and so forth. Thats only the tip of the iceberg. I'm designing a house in the south-east corner of the city and its a nightmare because of the narrow dimensions and Council rules!

For the most part, I mainly design road networks in dwelling in-fill areas/residential growth areas. And also site plans for extensions and redevelopments. I'm in the process of applying for an ABN and business name to do some consulting/drafting on the side.

I'd like to stick with the design side of things and leave the labour to other poor bastards :D

That sounds crazy hard. :D

They drum it into you hard enough. Things like this you need to know. Otherwise buildings fall down and people die ... pretty much.

For instance, my floors for my extension are made of timber, suspended over natural ground level. Now I need minimum 100mm clearance from ground to any timber member of the floor. If I use the narrowest timber, I could get away with meeting my existing floor level of 300mm above ground. Well I lose 100mm already from the clearance rule, so that leaves 200mm. Due to the length of my floor bearers of some 7.8m in continuous span, I need 190x45mm timber for my bearers. On top of that goes the 190x35mm floor joists. Well 100+190+190=480, which will be 180mm above my existing floor level of the existing building (not including the 22mm floor boards!). However, I can run the floor joists in single span (not continuous span) between (not on top of) the floor bearers = 100+190=290 which means it meets my current floor level. However, the single spans at (still) such a long span means I need to run them every 450mm, not 600mm to keep the 190x35 profile. Or 600mm at 190x45 profile.

So economically:

7.8m / 0.6 (600mm) = (13+1) 14 rows of joists

therefore 190x45 = 8,500 unit x 14 = 119,700

7.8m / 0.45 (450mm) = (17+1) 18 rows of joists

therefore 190x35 = 6,650 units x 18 = 119,700

Economically they will be identical in cost. So I might as well order more 190x45, rather than a bit of 190x35 and a bit of 190x45.

Lost yet??? And thats only the floor!!! I have to do this shit every week! :D

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • This looks great! Awesome to have the 5 speed with an LSD in this. The Recaro's look like SR2's or SR3's. It's a shame they've been retrimmed as they would have looked sweet in their original colours. I think I'd want my agent to be a little more up front and informative too. I've never imported but I reckon it would make me a little nervous, so the more info the better.
    • Thanks for doing that Duncan! Makes you a good person in my books. We don't get kangaroos or wombats here. But we have bats and it's similar. AFAIK it's often the mums with a baby attached that get hit because they drop lower when starting from a tree. If you hit an animal, check on it. https://www.ifaw.org/au/resources/wildlife-rescue-app An app to get the closest wildlife rescue contact.
    • My dream is also to have a proper hoist, but I don't think it will ever happen. My quickjack is probably as close as I'll ever get, it really is very good though. 
    • Yeah we keep on in the dailies, it is pretty poor how many animals get hit and the driver leaves without checking....have saved a couple of little ones over the years. Bit of a gruesome job though, pouches generally need to be cut open because they are so tight and often the joey doesn't realise mum is gone so they are still locked onto the teat. I checked the modules in front of the DS wheel where an oil cooler should go.... There is the radar unit - that can go for race use) One of the 2 HX water pumps, the silver cylinder. That needs to be kept but might be able to be relocated But the bad news, the big computer mounted vertically in front of the wheel (blocking any potential air exit) is the electric steering computer. That is required until/unless i do a hydraulic steering conversion, and in CAD based modern car design it is not like I can just pop a big unit like that somewhere else (plus the loom would be too short anywhere else too). So, the passenger side is OK to clear out (just use a smaller washer reservoir, potentially elsewhere), but the DS no beuno
    • Well, all the best with the new camry It was interesting to hear about the UK process, it is generally a lot more streamlined here with a shipping agent looking after all the import side (noting the exact final price can still be a surprise.....) and I've used a few different brokers on the japan (or US) side, and never had any trouble with any of them....luck of the draw I guess. You mentioned you didn't get the auction sheet (understandable since you bought it from a dealer, not auction), but I always try and get hold of that because they are pretty thorough. I've imported 2x R grade vehicles over the years and both were fine, repairs in Japan are pretty thorough compared to here in Oz.
×
×
  • Create New...