The residential area has expanded and they're trying to make the infrastructure keep up. That BP intersection is a nightmare and can't keep up with flow.

Road widening for a longer right hand turn lane off Port Wakefield Road into Paralowie and changing the intersection is being planned.

I work for a development planning company, so I know these things LOL

:D

haha the coppers are gona hate it they cut down the trees where they always use to park amongst with the camera just after the caltex. Think they park there cuz the speed zone drops to 90 pass the servo most people dont see the sign then get done doin 110 which is the speed limit for most of port wakefield rd.

The residential area has expanded and they're trying to make the infrastructure keep up. That BP intersection is a nightmare and can't keep up with flow.

Road widening for a longer right hand turn lane off Port Wakefield Road into Paralowie and changing the intersection is being planned.

I work for a development planning company, so I know these things LOL

:D

its actually all part of this Northern Expressway project (from the Port River Expressway / Port Wakefield Rd overpass right thru to the Gawler Bypass. Its incorporating a LOT of widening and improvements to Port Wakefield Rd thru to Waterloo Corner road, and up from there

http://www.dtei.sa.gov.au/infrastructure/n...way.html#whatis

What is the Northern Expressway?

The Northern Expressway Project consists of two components: the new Northern Expressway and the Port Wakefield Road Upgrade. The Northern Expressway will be a new 23 kilometre road linking the Gawler Bypass with Port Wakefield Road at a point about three kilometres north of the Waterloo Corner Road intersection.

To meet the demand of increased traffic volumes generated by the new expressway, Port Wakefield Road will be upgraded at key intersections between its intersection with the Northern Expressway and Salisbury Highway.

The Northern Expressway project is a joint initiative by the Australian and South Australian governments under the AusLink program. It will be the largest road construction project in the state since the 1960s

The Salisbury Council is looking to expand the residential zone further than Paralowie and Burton, so they're trying to get the road network right first go.

This means lots of ongoing and massive road works and headaches for residents in the area in the meantime.

Bout bloody time to!! Are they turning Pt Wakefeild road into a 3 lane highway or just keeping it as 2 lanes?? For one of the main highways into Adelaide its pretty piss poor really!

Just be glad when its all done its mayhem out there atm specially with the long weekend now, was talking to a truck driver here at work before and he said the traffic is banked up all along Pt Wakefield highway all the way back to the salisbury highway extension!

Bout bloody time to!! Are they turning Pt Wakefeild road into a 3 lane highway or just keeping it as 2 lanes?? For one of the main highways into Adelaide its pretty piss poor really!

Just be glad when its all done its mayhem out there atm specially with the long weekend now, was talking to a truck driver here at work before and he said the traffic is banked up all along Pt Wakefield highway all the way back to the salisbury highway extension!

in that link i put up theres a map n shit there. was tryin to work it out, could possibly be 3 lanes. hard to determine tho

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • That sounds like an excellent idea. But total self-sufficiency means exactly that. You have no-one else to blame when your system faults out and you have no power for a week or two while it gets fixed. You'd have to go the whole hog and get a diesel genny and all the switchover gear, to get you through such times. And, despite the fact that over 20 years, my system has been pretty reliable**, I have seen so many inverter explosions (or less dramatic deaths), panel and roof JB fires, and so on, over that time, to know that the stuff is the same as any other bulk Chinese manufactured stuff. The failure rate is well above zero - both on the equipment and on behalf of the meth addled installation labour force. And then..... warranty and means of redress against the supplier you bought the gear from. Best I can tell is that only a handful of solar companies are still around within 5 years of starting their advertising pitch. They disappear and phoenix like crazy. So, as per 1st paragraph, I suspect the only way to is go balls deep and spend maybe 2-3 times as much as you might think, so that you have every base covered. Plus, know and understand your gear intimately, so you can diagnose problems, sort them out yourself, etc, etc. Plus, probably have to consider upgrading various parts as the years pass, to maintain compatibility with newer stuff, performance and reliability, etc, etc. Whereas, remaining attached to the grid has an ongoing cost that keeps going up even if you use bugger all power from it. But it does provide the fallback in case of the worst case with your own gear. You either pay up front or as you go, I suspect.
    • Add more solar panels to the array. Call the electricity company and tell them you're moving out... Live off grid electric wise
    • Hi Jasmine. How's the war going?
    • I'm extremely suspicious of the VPP stuff. Best I can tell, you surrender any and all control of your panels and battery to the VPP, because there's no way that anyone could write a sufficiently useful set of "rules" as to how much you would be willing to let out of your export meter at any given time. If one of your main interests is to have enough in your battery every evening to get you through the night without having to import, you could easily find yourself with nothing in your battery at the end of the day, or part way through the night, and then be paying import pricing instead of paying nothing. I cannot see how this cannot come to pass.
    • majority aftermarket is an10 yes, but majority of OEM is An12 r35 OEM cooler lines at close to an 12, the hard line that car uses is almost 20mm  Porsche OEM is also AN12   i figure, if our power levels are close to 1000hp, then AN12 should be a must if many OEM standard power vehicles use AN12
×
×
  • Create New...