Jump to content
SAU Community

Recommended Posts

hmmmm i just went and checked his site and got "bad gateway" when i tried clicking on the link to the diagram

I have the RB25 diagram here, but it's a huge file... so i cant attach it. :Oops:

i tried sticking it here, but by the time it was resized, its barely readable.

*click*

Hi guys,

Does anyone know how or where I can get my hands on wiring diagrams for a Neo RB25DE out of a R34 and one for an RB25DET out of the same model.

I have tried my local Nissan dealer and they have been unable to source them for me.

Any help much appreciated.

Cheers,

Brett

Is this to fin out which extra wires are needed for the engine? I really think if you just plug the DET ECU into the harness you won't have mcuh trouble...may just give an error code for a few missing sensors...but nothing that should impact the performance....you may even find that you don't have a boost cut.

By the way are you upgrading the fuel pump, my one didn't have the balls to keep up with the DET injectors.

Yeah, it is to try an figure out which wires are missing. My thinking (read: personal experience) is that if I use the harness out of the cut that I have and use it to replace the harness that is in the R34 at the moment, all should be well. Just want to make sure.

I have found a site though. www.pitstop.net.au. Has just about all the workshop manuals you can get. Although the R34 ones have to be ordered in.

666Dan: Everything that is in the front cut that is 100% working will be swapped over into the 34.

  • 2 weeks later...

Thanks to SKY031 for the wiring diagram. Very helpful. However, I still have to send the wiring harnesses down to Sydney (Quick Fit Motorsport) to get the wiring harness out of the Stagea front cut adapted to my car.

Moral of the story. Don't live in Coffs Harbour if you want to any modifications to your car!! If you do, prepare to travel. :cheers:

Anyway, that out of my system, hopefully my car will be off the road next week getting the RB25DET into it. Cant wait. :wassup:

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • Food for thought, the stock oil filter thread is a 3/4-16 UNF, which has an ID of about 10 to 12mm (according to ChatGPT lol). Now compare than to an 10AN, which has an ID of about 14mm (Raceworks is 14.2mm, Speed flow is 14.27mm).  
    • Yep, totally get that. However hooking in for Generator back up is only a few hundred bucks for the wiring. You could put a couple of those in (for different circuits explicitly) and run a couple of baby generators. Bonus, you can balance them across different circuits, and now have backups in your backup. I'm looking at buying places that won't even have water etc, and I don't mind the idea of getting off the electric grid either, even with everything you've said. This country already has enough power outages that even the mains grid isn't that reliable anymore. I do agree though on spending a bit more to get better gear, and to add some extra redundancy in to the system too.
    • You can set hard reserves on your battery system, and it can't be discharged past that.  
    • That sounds like an excellent idea. But total self-sufficiency means exactly that. You have no-one else to blame when your system faults out and you have no power for a week or two while it gets fixed. You'd have to go the whole hog and get a diesel genny and all the switchover gear, to get you through such times. And, despite the fact that over 20 years, my system has been pretty reliable**, I have seen so many inverter explosions (or less dramatic deaths), panel and roof JB fires, and so on, over that time, to know that the stuff is the same as any other bulk Chinese manufactured stuff. The failure rate is well above zero - both on the equipment and on behalf of the meth addled installation labour force. And then..... warranty and means of redress against the supplier you bought the gear from. Best I can tell is that only a handful of solar companies are still around within 5 years of starting their advertising pitch. They disappear and phoenix like crazy. So, as per 1st paragraph, I suspect the only way to is go balls deep and spend maybe 2-3 times as much as you might think, so that you have every base covered. Plus, know and understand your gear intimately, so you can diagnose problems, sort them out yourself, etc, etc. Plus, probably have to consider upgrading various parts as the years pass, to maintain compatibility with newer stuff, performance and reliability, etc, etc. Whereas, remaining attached to the grid has an ongoing cost that keeps going up even if you use bugger all power from it. But it does provide the fallback in case of the worst case with your own gear. You either pay up front or as you go, I suspect.
    • Add more solar panels to the array. Call the electricity company and tell them you're moving out... Live off grid electric wise
×
×
  • Create New...