Jump to content
SAU Community

Recommended Posts

I'm getting my RB25DE (Non VCT) Head sent in to be reconditioned as soon as I make my mind up if I should get a little bit of work done to it.

I've been told that the most befinitial work is the first stage of work that is relatively cheap ($300). This cleans up the area around where the valves are to make it flow a bit smoother.

When performing head work it obviously increases the amount of flow and reduces the restriction.

SO.. would it be correct to assume that you could make as much power with slightly less boost as boost is a restriction to the flow of air?!?!?

Yep Joel, plus the turbo will come onto boost earlier (lower rpm) and faster. Off boost performance will increase as well and fuel economy will improve (unless you use the extra power of course).

Thaaaankyou.. :) Just what I wanted to hear.

I'm getting Chris Milton Engineering to do the work as he was one of the nicest blokes to talk to and gave me 1 hr of his time explaining a little about heads and previous jobs they have done regarding the RB25/30 conversions etc.. :)

He said it is worth while working on both the inlet and exhaust ports around the valve area.

He also said that Port matching is mainly used on the older Dinosaur engines and wouldn't be required on the RB unless you are after every little bit of power.

Hence $$ to Performance ratio is bad. :P

Its amasing how many people actually bagged the Jap import motor, one bloke even stating that if it were up to him all of the Jap cars would be sitting at the wreckers.

Thanx Again Gary.. :D

Hi Joel, whilst the standard Nissan stuff is pretty good (not perfect), I have seen some pretty average port alignment with aftermarket manifolds (both inlet and exhaust). They just don't line up properly and I reckon this may be the reason why some people get bad results from expensive bolt on manifolds.

I always check the alignement of the head, gaskets and manifolds, and in 5 out of 10 cases I have to get out the die grinder to tidy them up.

The ice age caught up with the dinosaurs and they are extinct, some people just don't know it yet.

Joel,

I reckon i am neck to neck with you on your RB30/25 build!

i am dropping my heads off next wednesday (payday) at a place in melbourne to get built.

I have a couple of questions for you:

1. Are you replacing the factory RB25 valve springs with harder items?

2. how much are you spending on a complete end to end process? (for me including springs etc, i am puttting aside 1K?. should be getting some change)

3. what components of your head are you getting built? (re-seated?, new guides?, etc)

thanks Joel/sydneykid,

Trev,

Hello Sydneykid.

What is your approach port matching ? I have done it a couple of times, and have my own method, although it is a fair bit of work.

What I do is very carefully make a sheet metal template that just slides onto the manifold studs, and with a die grinder, match the metal template to the head ports. I then transfer the template to the inlet manifold, and remove minimum material from both, so template and manifold match exactly.

Then go back and check the head again. Eventually the metal template matches both exactly, so in theory the manifold should then match the head as well with a very smooth transition.

I am in the process of rebuilding and upgrading my flow-bench at the moment, and find all this particularly fascinating.

JNR.. Including a VRS kit the whole lot is costing around 1k.

I'm using the standard valve springs as it won't be reving super high so they don't need to be changed.

I'll ask Chris about valve springs when I drop the head off.

Although he didn't mention it so I gather the standards are fine.

I dont know exactly, they told me that they didnt like quoting without seeing the car????

He just picked up a price sheet from another job and said it will be $1500 to remove the head, disassemble the head, mild port, reseat the valves (which he said had to be done because they couldnt guarantee they would seat after they had been in the port with a dremel tool) and to reassemble and fit.

I was under the impression that it would cost about $3-400 to remove and replace a head, and if the port is $300, then that is $8-900 to strip the head, do valves and refurbish. Not IMHO very good value.

EDIT: and that price included me providing a head gasket.

Yer I wasn't going to worry about porting as it really isn't that necessary.

The biggest restriction is apparently around where the valves are so that is what he recommended I do first.

Call it Stage 1 if you like.

I was quoted ~$400 for the head recondition including putting it all back together and then $300 for the head work.

I was quoted to replace a head gasket a while back steve and it was in the vicinity of $600+

Originally posted by -Joel-

Yer I wasn't going to worry about porting as it really isn't that necessary.

The biggest restriction is apparently around where the valves are so that is what he recommended I do first.

Call it Stage 1 if you like.

I was quoted ~$400 for the head recondition including putting it all back together and then $300 for the head work.

I was quoted to replace a head gasket a while back steve and it was in the vicinity of $600+

Well I didnt want the head recoed, but anyway using your figures $400 + $300 + $600 = $1300 LESS the cost of head gasket which are around $150odd, so should be 1150 not 1500. Why is it that they quote me $350 more than you? And that was a rough quote, he said it could be more.

Yer not sure Steve.. ?!? So that $1500 was supplying the VRS Kit?

A VRS kit for me is $265 that comes with all the rocker cover gastets, cam gaskets i think it was?!, Head gasket, inlet manifold gasket, exhaust gasket, valve stem seals etc..

If you just want to buy the valve stem seals they cost $330 which. If you were to pull the head off you would want to do the valve stem seals obviously anyway.

He didnt say.

Was a bit vague/cagey about giving out info. Just kept saying that he couldnt really say how much it would cost me, I'd have to bring the car in.

I got the impression that he didnt have much to do with headwork, or just didnt want to answer my questions.

dont know the name of the guy I spoke to...ah well, might just stick with AED:) Only that way I gotta remove the head myself:(

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • Greg speaks wisdom. These dirty old Datsuns are only value when they are cheap. When they are not cheap, there is no value. Sounds contradictory, but it's true. We are now 20 years past the hey day of modifying cheap 90s JDM cars for small amounts of money. This is a different world. If you are rich and can afford not to care about what is effectively wasting money on an old Datto shitter, then I have no reason to argue against it. But if you are wanting to experience what we all experienced back in 2005 (and I bought my car last century!) then there is no way to do it.
    • Short answer: No. Medium answer: No, because you still need to conjure the things out of thin air to bolt them to a NA to make it a NA+T. Long Answer: No - The things you need to conjure - meaning a turbo, intercooling, manifolds, exhaust, intake/manifold/piping, clutch, injectors, fuel pump, AFM (?), ECU + Wiring (woo, N/A loom fun) have to come from somewhere. You could have many scavenged these things from an OEM car that someone had upgraded from and use some of these. This will be cost prohibitive now, especially so in the USA. You'd probably pay the same for newer, upgraded components that are better than old OEM stuff from 25-30 years ago. None of these big ticket items are re-usable for the N/A car. Why not buy new and upgrade while you're there? The only real consideration is turbo and fuel sizing and determining whether you want to stay within the bounds of the OEM engine or get into rebuild territory. These limits ARE lower with a N/A motor and especially N/A gearbox at the starting point. And if you're gonna upgrade those then you may as well consider having them built to begin with. Because everyone here knows you're never far from that next engine rebuild once you start making the power you want... The cars you see on the internet and SAU etc have been built over decades. If you're really clued in... you would sell your US car to somebody for what you paid for it. You would then scour AU JDM pages or SAU and buy a car like Dose's on this forum with your powerful American Dollar. This will save you so much money in the long term. Importing it could be tricky. Or it might not because USA. I have long said the only reason 90's Japanese stuff took off was because a) Japanese people had Japanese cars so that is what they used b) Australians could import these cars to Australia with very minimal changes and use them on the road here c) Neither country had well-priced access to US or EU Sports Cars. I don't believe the JDM scene would have taken off in Australia at all if we had EU priced EU BMW M offerings, or more especially the AUS V8 Scene would never have existed if we had the multitude of US cars like Camaros, Mustangs, Corvettes at the prices you folks do. After all - Do the math. I would say put a V8 in your R34 and that's the smart way forward. It is. I did it. I know this from my own experience. But at that point there's no reason to simply not buy a C5 or C6? It would be simpler and easier and cheaper and bette-
    • Reading all this... hurts lol. I have an ENR34 5MT and I paid an inflated USA price for the car alone, had to do tons of preventative maintenance past that, and so I'm over $30K USD into the car already and haven't even touched power.  I wanted to +t it. Not even trying to make GTR numbers, I'd be happy with 250hp.  Can I get away with paying much less to make that happen?
    • Damn you’ve done well, definitely snapping necks.
    • Great weekend and event. Open fire at the caravan park, perfect weather all day and a great feed and a couple of drinks at at awesome country pub.
×
×
  • Create New...