Jump to content
SAU Community

Inner West Crew Whoretown (toowong/st Lucia/kenmore/indooroopilly And Sometimes Sunnybank?)


Recommended Posts

That is actually the case here :P

Just been offered a position up in NT, 20k more a year on a 7 on 7 off roster, flights to cairns paid for. Interesting.

Sounds good. But Cairns <> NT?

Didn't you hear? NT Bought Cairns from QLD....

Sounds good. But Cairns <> NT?

It's out on site at Groote Eyelant, they fly you to either Darwin or Cairns. Cairns would be my pick as I'd like to still live in Brisbane.

I'm considering the position but it could be difficult with already renting here, have gf here etc.

It's out on site at Groote Eyelant, they fly you to either Darwin or Cairns. Cairns would be my pick as I'd like to still live in Brisbane.

I'm considering the position but it could be difficult with already renting here, have gf here etc.

Well not really... just fly in fly out.... misses stays at the house whilst your up north... besides she runabouting in NY lol .

7 on 7 off is a f**kin epic roster. 20k more to work 6 months of the year lol. Sounds like a decent deal. I'm waiting to hear back on whether our stuff out in WA is going to take off. But our rosters are shit and it's only 40% loading.

would be about 5K a year for the 52 flights you'd need to, take out tax as well and your probably up 10K, which isn't bad at all.

Naah the replacements are all 22" widescreen thingos. Not even full 1080P :down:

How the hell does anyone get any work done on those things?

I'd rather bring in my own monitor instead of use those sort of things.

Edited by sneakey pete

7 on 7 off is a f**kin epic roster. 20k more to work 6 months of the year lol. Sounds like a decent deal. I'm waiting to hear back on whether our stuff out in WA is going to take off. But our rosters are shit and it's only 40% loading.

7/7 is only used on two sites, groote eyelandt and the one in Mt Isa, I think because they're both quite remote.

20k is the site allowance annually. There's also away from home allowance of $14 per day, as well as the 4.5 hours overtime we have to do as they work 12 hour days. It works out to be around 370 per day. They pay for accomodation, your food, internet etc.

would be about 5K a year for the 52 flights you'd need to, take out tax as well and your probably up 10K, which isn't bad at all.

How the hell does anyone get any work done on those things?

I'd rather bring in my own monitor instead of use those sort of things.

Yeah + overtime and all the other allowances. Minus the cost of food and living expenses out there it would end up being quite a bit more.

7/7 is only used on two sites, groote eyelandt and the one in Mt Isa, I think because they're both quite remote.

20k is the site allowance annually. There's also away from home allowance of $14 per day, as well as the 4.5 hours overtime we have to do as they work 12 hour days. It works out to be around 370 per day. They pay for accomodation, your food, internet etc.

Yeah it depends on the work you do aswell. I find most of the consultants and IT people get the better rosters. For the kind of stuff I'm looking at, supervision/site engineer/coordinator what ever they want to call it, the best roster would probably be 2 weeks on 1 week off. For Multiplex the standard is 3 weeks on 1 week off. I'd probably prefer it that way as you get f**k all done in a week anyway, long term planning especially would become a pain.

Yeah it depends on the work you do aswell. I find most of the consultants and IT people get the better rosters. For the kind of stuff I'm looking at, supervision/site engineer/coordinator what ever they want to call it, the best roster would probably be 2 weeks on 1 week off. For Multiplex the standard is 3 weeks on 1 week off. I'd probably prefer it that way as you get f**k all done in a week anyway, long term planning especially would become a pain.

Ours are a bit more flexible as we contract to the client and while IT is a critical service each of us are easily replaced so it's not like a site supervisor where if you're missing for 10 minutes the whole plant could fall apart. To the right people, supervisors with experience on site are big dollar positions, some of the project directors I know of are on the better side of 400.

Yeah you don't get to Project Director on jobs that size by being useless lol. Most of those guys have got shitloads of experience on big jobs. I'll be happy looking after (read - f**king up) a small bit of rail somewhere or a bridge or some mine facilities. Much easier than residential construction

I remember one of our first year speakers who was a civil engineer (before the engineering streams split off), said that his first project was a bridge somewhere on the bruce highway or something. Not exactly his proudest creation.

wow this place has become very lively in the last few days.

whats this i read about a Petrie outting?? (sorry to lazy to read 4 pages to find it)

Option one is gooood for tires. got mine there, and the first place ive found that can actually balance a tire propperly. specific sizes take a few days to get so call them in advance.

Option one is gooood for tires. got mine there, and the first place ive found that can actually balance a tire propperly. specific sizes take a few days to get so call them in advance.

Everyone seems to be telling me the same thing so might give them a buzz and pick up some federals for $210 each... or the achillies ones for $170 each.. hmm :O worth the extra $80?

Yeah you don't get to Project Director on jobs that size by being useless lol. Most of those guys have got shitloads of experience on big jobs. I'll be happy looking after (read - f**king up) a small bit of rail somewhere or a bridge or some mine facilities. Much easier than residential construction

Most of those guys have just moved up over time. Happen to be in the right place at the right time and network their way around the company. Everyone reckons qualifications will land you the bucks but it's certainly who you know when you're inside the company. One of the guys up north started off as an apprentice sparky 10 years ago, now the electrical engineering manager for the project.

I'm hoping to do a bit of project management myself soon as I often find myself directing most of the other teams around when we're doing project work. Not many people take too well to a 21 year old telling em' what to do!

Also, have an eboost 2 black face here for sale, used, no box. Perfect working condition (not like anything can go wrong with these anyway). New ones retail around the $795 from justjap, it's for my housemate so make an offer. He was considering the $450 mark.

Yeah moving up over time hence a boatload of experience. Qualifications get you in but its how well you actually do the work and the right people know that you do the work well lol

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Latest Posts

    • Also, I logged some data from the ECU for each session (mostly oil pressures and various temps, but also speed, revs etc, can't believe I forgot accelerator position). The Ecutek data loads nicely to datazap, I got good data from sessions 2, 3 and 4: https://datazap.me/u/duncanhandleyhgeconsultingcomau/250813-wakefield-session-2?log=0&data=7 https://datazap.me/u/duncanhandleyhgeconsultingcomau/250813-wakefield-session-3?log=0&data=6 https://datazap.me/u/duncanhandleyhgeconsultingcomau/250813-wakefield-session-4?log=0&data=6 Each session is cut into 3 files but loaded together, you can change between them in the top left. As the test sessions are mostly about the car, not me, I basically start by checking the oil pressure (good, or at least consistent all day). These have an electrically controlled oil pump which targets 25psi(!) at low load and 50 at high. I'm running a much thicker oil than recommended by nissan (they said 0w20, I'm running 10w40) so its a little higher. The main thing is that it doesn't drop too far, eg in the long left hand fish hook, or under brakes so I know I'm not getting oil surge. Good start. Then Oil and Coolant temp, plus intercooler and intake temps, like this: Keeping in mind ambient was about 5o at session 2, I'd say the oil temp is good. The coolant temp as OK but a big worry for hot days (it was getting to 110 back in Feb when it was 35o) so I need to keep addressing that. The water to air intercooler is working totally backwards where we get 5o air in the intake, squish/warm it in the turbos (unknown temp) then run it through the intercoolers which are say 65o max in this case, then the result is 20o air into the engine......the day was too atypical to draw a conclusion on that I think, in the united states of freedom they do a lot of upsizing the intercooler and heat exchanger cores to get those temps down but they were OK this time. The other interesting (but not concerning) part for me was the turbo speed vs boost graph: I circled an example from the main straight. With the tune boost peaks at around 18psi but it deliberately drops to about 14psi at redline because the turbos are tiny - they choke at high revs and just create more heat than power if you run them hard all the way. But you can also see the turbo speed at the same time; it raises from about 180,000rpm to 210,000rpm which the boost falls....imagine the turbine speed if they held 18psi to redline. The wastegates are electrically controlled so there is a heap of logic about boost target, actual boost, delta etc etc but it all seems to work well
    • hahah when youtube subscribers are faster than my updates here. Yes some vid from the day is up, here:  Note that as with all track day videos it is boring watching after the bloopers at the start.  The off was a genuine surprise to me, I've literally done a thousand laps around the place and I've never had instability there; basically it rolled into oversteer, slipped, gripped and spat me out. On the way off I mowed down one of the instructor's cones and it sat there all day looking at me with accusing cone eyes as I drove past. 1:13:20 was my fastest lap, and it was in the second session, 3rd lap.  It (or me!) got slower throughout the day as it got hotter.      
    • It sounds like you want what the Toyota Landcruisers have for their roof racks. Wanna know what you end up with? Rust holes in the roof, and water everywhere...
    • Discovered today that if I select reverse first and take my foot off the brake, then select drive, the drive indicator light works and so does the tiptronic gear indicator. 
    • Ok so after much research and talking with knowledgeable people I've got my turbo conversion done and it's all running great other than 1 small issue.  Car has remained auto with the na auto and tcm, I've used a stagea ecu with. NIstune board and everything is great other than my gear selection on the dash. It illuminates park, reverse, neutral, 3rd and 2nd. But nothing drive or what gear your in when you pop it into tiptronic.  I'm sure there is maybe 1 wire in the ecu plug I need to move to rectify this. Does anyone here have any ideas?   Cheers guys
×
×
  • Create New...