Jump to content
SAU Community

PowerFC ECUs w/ Hand Controllers (NEW & under $1000!)


Recommended Posts

UPDATE:

I bring good and bad news. First, the good: Brent has already heard back from the supplier. Now, the bad: there are significant supply problems for PowerFCs at the moment (whadda know, just my luck). Apexi is very low on stock.

This is how it breaks down:

  • BNR 32/32 89/8- 98/8 RB26DETT PFC 414-N029 H/C 415-X001

2 units will be available at the end of November; 2 at the end of December.

  • ECR33 93/8-98/4 RB25DET PFC 414-N012 H/C 415-X001 Series 1 & 2

These units are very scarce at the moment. Units will be ready by the end of December.

  • S15 99/1-02/7 SR20DET PFC 414-N018 H/C 415-X001

These are in stock.

  • RPS13 94/1-96/7 SR20DET PFC 414-N015 H/C 415-X001

This is available.

  • 180SX RPS13 91/1-93/12 SR20DET R/ HEAD PFC 414-N014 H/C 415-X001

Units will be ready by the end of December.

  • SILIVIA PS13 91/1-93/9 SR20DET R/ HEAD PFC 414-N014 H/C 415-X001

These are available.

  • RX7 FDS 1- 3 91/12-95/11 13B-REW PFC 414-Z004 H/C 415-X001

This is available.

Now the obvious question is: how long are people willing to wait to receive their PowerFC(s)? I imagine some people are only prepared to wait 2-3 weeks, whereas for people like me, its not a huge issue.

The problem is that Apexi doesn't seem to have any stock. Except for those stores actually sitting on stock, I am led to believe we would have much the same problem ordering elsewhere.

I need to know who is willing to wait (where there is no supply), and who isn't? Please contact me and let me know.

Assuming we still have the numbers to go ahead a final price will be given on Tuesday November 30, and payment will need to be made between Wednesday December 1 and Friday December 3 (and must be recieved by Friday).

Sorry it isn't better news.

Lucien.

  • Replies 247
  • Created
  • Last Reply

Top Posters In This Topic

if anyone pulls out of this count me in as i am very keen and have the cash!

spewin i missed out of the group buy, as i only joined this forum today!

Why has Brent waited until now to say he doesn't have stock of Power FCs?

Is it possible to pay when he actually receives stock, instead of paying $1000.00 now and waiting two or more months for delivery?

Thats true.. when he offers a group buy of more than 20, it would have been good to make sure he can get 20 first :D oh well we see how long we have to wait!

Price drop by $100.00 for every month we have to wait... :D

At least it'll give me some time to work on the EBC bulk buy.

I think my second order will be cancelled, but I'll still be in for one. I'll get back to you with confirmation though.

Guys,

I will answer all the PM and emails tomorrow: I am taking the night off as I am tired and don't feel particularly well. Moreover its better for me to just sit down and go through everything in one hit tomorrow than some tonight, and some tomorrow.

babs: I will PM you.

Apologies to anyone that tried to call me this afternoon: my phone decided to turn itself off (anyone with a T86i would know about this particular 'bug').

Lucien.

umm instead of paying it all up?

how about we pay like an initial deposit to confirm our intentions of buying one and when brent actually has them ordered, we pay the rest of the money. So we feel more secure about our money, and he feel safe about us not pulling out, at least if we do, we lose the money or something.

Say pay 500 of the initial price...

just an idea, coz paying 1000 now and then waiting a month for it, i rather pay 500 now, use the other 500 for something productive...den make another 500 to pay the rest of the pfc off..!!!

If Brent agree, I'd go with deposit system. At least it shows our intention to pay the full amount as soon as item is available in stock. I know I do want one!

Right,

I was going to post this yesterday evening but the forums disappeared.

Is it possible to pay when he actually receives stock, instead of paying $1000.00 now and waiting two or more months for delivery?

No because Brent is required to pay upfront when he places the order with the supplier for all the units, which would be next week. He isn't willing to, or capable I imagine, or paying for $36k of stock upfront on promises of payment.

I think my second order will be cancelled, but I'll still be in for one. I'll get back to you with confirmation though.

Can you let me know?

how about we pay like an initial deposit to confirm our intentions of buying one and when brent actually has them ordered, we pay the rest of the money. So we feel more secure about our money, and he feel safe about us not pulling out, at least if we do, we lose the money or something.

Say pay 500 of the initial price...

just an idea, coz paying 1000 now and then waiting a month for it, i rather pay 500 now, use the other 500 for something productive...den make another 500 to pay the rest of the pfc off..!!!

Again, Brent needs to pay for the full cost of the order upfront at the time its placed. In this senario he would have to cover $18k worth of order on his own, and he is not willing to do that.

In fact, this is exactly what Brent said:

People may say. "I will just pay at the end of the month" It doesnt work like that. In order for those PFC`s & H/C`s to be made up they have to be paid for up front. ie I have to pay Apexi.

I have not heard back for a lot of you. Please let me know of your intentions. As it currently stands...:

I have moved this list to the first page

Those who are unkown, please contact me ASAP.

Again, sorry about the delay in my reply but more important issues cropped up in the last 24 hours and then the forums decided to die.

Cheers,

Lucien.

Sorry if it has been mentioned above, but I'm in a hurry...

When does payment have to be made/received by?

Also, are the units guaranteed for the end of December? What happens if it's mid-January and we're still waiting? Refunds, further discounts, or is that the risk we are taking?

List updated (see first post). Please contact me directly if you are unknown, or listed incorrectly.

To those who are asking to be included: please be patient, I want to try and sort out those who confirmed first, and then I will worry about others.

Sorry if it has been mentioned above, but I'm in a hurry...

When does payment have to be made/received by?

Also, are the units guaranteed for the end of December? What happens if it's mid-January and we're still waiting? Refunds, further discounts, or is that the risk we are taking?

If all goes according to plan, payment would need to be made by the end of this week.

As for guarantees, I doubt anyone can provide absolutes: I can't (obviously, I am just a buyer like you), Brent can't as he is dependent on the supplier, and the supplier probably won't. The point you raise is valid. I doubt further discounts would be forth coming (as that would mean Brent would be out of pocket), but I will ask what happens if things get delayed unreasonably.

I have made some enquires with Greenline to see if they have a similar problem, and initial indications is they may have more stock on hand but that ECR33 units are also tight, so as Brent suggested this seems to be a problem with the supplier (Apexi). I have asked for a few more details, but I am disinclined to switch supplier unless Greenline is able to supply significantly more units as I think it looks bad both for me and for the forum/club.

Lucien.

It looks bad for Nengun offering units they cannot supply, so if Greenline have the units in stock, then take our business there.

What is Greenline's web-site address? Maybe I will be able to sort out an EBC bulk purchase with them, considering Nengun only offer two different models (Power FC kit and AVC-R).

It pains me to do this, but I am going to call off the group buy. :(

My decision has been prompted by the unfortunate combination of short supply, the forthcoming Christmas and New Year period, and the necessity to pay now and wait for an unknown time.

I have spoken to Brent about regarding the concern about the time frame dragging out beyond the quoted dates. Not suprisingly he can't give any guarantees as he is dependant on Apexi and their ability to deliver on time is unknown.

Given the number of people who would be without units for a signficiant period and the sums involved, I do not think it is worth the risk of unhappiness should delivery times not be met. Brent seems to be of the same opinion. I would feel personally responsible if people did not receive their PFC/s by the end of December, and I would be powerless to do much about it.

I am very sorry to have got people interested and hopeful. In hindsight, had I been aware of the possible delays I would never have suggested the group buy, but I only found out a few days ago, all of an hour or so before you did.

Evidently despite agreeing to continue, a number of you have significant concerns about delivery times: this has been expressed to me, and directly to Brent by some people.

Again, you have my most sincere apologies. If I could do something to speed up delivery I would, but at the end of the day I am in exactly the same situation as you: just a buyer in the groupbuy.

Brent has suggested that we wait until the new year and try again when supply is hopefully more available, and there isn't the prospect of holidays, etc. It is evident that there is significant interest in such a groupbuy so I encourage people to consider putting another groupbuy together. I, however, will not be doing it. Not to beat my own drum, but I have spent countless hours on this groupbuy and the prospect of having to do it again is not very appealing.

That's about it. Thanks again for your interest and I am sorry the result has not been more positive.

P1E: Greenline expects a delivery soon, but they were extremely vague on just what they could supply. Units from the delivery are already allocated so its hard to say just how many would be available. I am yet to hear back from them when I replied asking for more details.

Lucien.

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • Wheel alignment immediately. Not "when I get around to it". And further to what Duncan said - you cannot just put camber arms on and shorten them. You will introduce bump steer far in excess of what the car had with stock arms. You need adjustable tension arms and they need to be shortened also. The simplest approach is to shorten them the same % as the stock ones. This will not be correct or optimal, but it will be better than any other guess. The correct way to set the lengths of both arms is to use a properly built/set up bump steer gauge and trial and error the adjustments until you hit the camber you need and want and have minimum bump steer in the range of motion that the wheel is expected to travel. And what Duncan said about toe is also very true. And you cannot change the camber arm without also affecting toe. So when you have adjustable arms on the back of a Skyline, the car either needs to go to a talented wheel aligner (not your local tyre shop dropout), or you need to be able to do this stuff yourself at home. Guess which approach I have taken? I have built my own gear for camber, toe and bump steer measurement and I do all this on the flattest bit of concrete I have, with some shims under the tyres on one side to level the car.
    • Thought I would get some advice from others on this situation.    Relevant info: R33 GTS25t Link G4x ECU Walbro 255LPH w/ OEM FP Relay (No relay mod) Scenario: I accidentally messed up my old AVS S5 (rev.1) at the start of the year and the cars been immobilised. Also the siren BBU has completely failed; so I decided to upgrade it.  I got a newer AVS S5 (rev.2?) installed on Friday. The guy removed the old one and its immobilisers. Tried to start it; the car cranks but doesnt start.  The new one was installed and all the alarm functions seem to be working as they should; still wouldn't start Went to bed; got up on Friday morning and decided to have a look into the no start problem. Found the car completely dead.  Charged the battery; plugged it back in and found the brake lights were stuck on.  Unplugging the brake pedal switch the lights turn off. Plug it back in and theyre stuck on again. I tested the switch (continuity test and resistance); all looks good (0-1kohm).  On talking to AVS; found its because of the rubber stopper on the brake pedal; sure enough the middle of it is missing so have ordered a new one. One of those wear items; which was confusing what was going on However when I try unplugging the STOP Light fuses (under the dash and under the hood) the brake light still stays on. Should those fuses not cut the brake light circuit?  I then checked the ECU; FP Speed Error.  Testing the pump again; I can hear the relay clicking every time I switch it to ON. I unplugged the pump and put the multimeter across the plug. No continuity; im seeing 0.6V (ECU signal?) and when it switches the relay I think its like 20mA or 200mA). Not seeing 12.4V / 7-9A. As far as I know; the Fuel Pump was wired through one of the immobiliser relays on the old alarm.  He pulled some thick gauged harness out with the old alarm wiring; which looks to me like it was to bridge connections into the immobilisers? Before it got immobilised it was running just fine.  Im at a loss to why the FP is getting no voltage; I thought maybe the FP was faulty (even though I havent even done 50km on the new pump) but no voltage at the harness plug.  Questions: Could it be he didnt reconnect the fuel pump when testing it after the old alarm removal (before installing the new alarm)?  Is this a case of bridging to the brake lights instead of the fuel pump circuit? It's a bit beyond me as I dont do a lot with electrical; so have tried my best to diagnose what I think seems to make sense.  Seeking advice if theres for sure an issue with the alarm install to get him back here; or if I do infact, need an auto electrician to diagnose it. 
    • Then, shorten them by 1cm, drop the car back down and have a visual look (or even better, use a spirit level across the wheel to see if you have less camber than before. You still want something like 1.5 for road use. Alternatively, if you have adjustable rear ride height (I assume you do if you have extreme camber wear), raise the suspension back to standard height until you can get it all aligned properly. Finally, keep in mind that wear on the inside of the tyre can be for incorrect toe, not just camber
    • I know I have to get a wheel alignment but until then I just need to bring the rear tyres in a bit they're wearing to the belt on the inside and brand new on the outside edge. I did shorten the arms a bit but got it wrong now after a few klms the Slip and VDC lights come on. I'd just like to get it to a point where I can drive for another week or two before getting an alignment. I've had to pay a lot of other stuff recently so doing it myself is my only option 
    • You just need a wheel alignment after, so just set them to the same as current and drive to the shop. As there are 2 upper links it may also be worth adding adjustable upper front links at the same time; these reduce bump steer when you move the camber (note that setting those correctly takes a lot longer as you have to recheck the camber at each length of the toe arm, through a range of movement, so you could just ignore that unless the handling becomes unpredictable)
×
×
  • Create New...