Jump to content
SAU Community

Recommended Posts

Looking at replacing my standard ceramic turbos on a R32 GTR.

One option is to high flow current turbos and fit steel wheels and 360 degree thrust bearings.

Or what? There are so many to choose from. I am after somewhere around 250 to 270rwkw. So will continue using low mount twins and internal wastegates

GTSS

GT2510, 2530.

Did a search and found lots of info for gts t's. What do you use on a GTR?

Link to comment
https://www.sau.com.au/forums/topic/91491-turbo-upgrade-gtr/
Share on other sites

for 250-270 rwkw the stock ones can do it. the only problem is as you pointed out is that they are ceramic and may not last long ;) in that case GT SS should be about right for your target.

Great info. Thanks for that. Everytime I did a search I got something like 60 pages. Mostly about RB25. Need to learn how to use the search engine better.

I think we have to let Prank know there is a problem with the search function  ;)

try these

http://www.skylinesaustralia.com/forums/in...3entry1582993

http://www.skylinesaustralia.com/forums/in...showtopic=80624

Guest
This topic is now closed to further replies.


  • Similar Content

  • Latest Posts

    • Is it alright to top up with just another green coolant?
    • thanks GTSboy. My confusion at the moment is i am trying to locate the ignition, ECU battery power and the ECU negative The closest thing i can find is the for the S15 on Page 8 of the Wiring Specialties web page https://drive.google.com/file/d/0B9F33_M_GgENQnZ6STMxVmVNd1E/view?resourcekey=0-eZ4nNRwRoqa1qvKlWWHm8A I cannot find the same diagram for the R33 RB25DET Series 2 dash plug pin out.... Do you know what the Pins? or know where i can find the same pinout diagram for the RB dash plug? Thanks for the advice on the box... i like a 6 speed so might be on the lookout or the box now.. a topic of discussion for another post...
    • Will have a look at that. I cant see any leaks 
    • Put another overflow bottle (ie, a 1.25 coke bottle or similar) under the overflow hose and see if it is being pushed out there or if it is disappearing into the engine.
    • Staring on a stand is no issue. You just have to wire everything up, give it fuel and cross your fingers that the stand is robust enough. Arranging the inlet plumbing is often the hardest part, without any surrounding structure to hand some of it from. No need for coolant if you only want to run it for <1 minute. As to the gearbox - I think the little Aisin box is a bit stronger than the other small Nissan boxes that went behind SRs, but I wouldn't be too keen to test its limits with the torque of a boosted 25. I don't know if you can retain the box and the tailshaft. The box won't connect to the RB without an adapter of some sort, which is either a plate that will push the engine forward (which is not good for fitting it into the bay's available space) or push the box back, which messes with the box position and tailshaft length - OR - cut and shut work on the bellhousing, which is a long way from "least modification". I'd be buying a new 370Z 6 speed or similar, doing what has to be done to that to make it fit RB (ie, cut and shut bellhousing) and the requisite tailshaft custom/mods.
×
×
  • Create New...