Jump to content
SAU Community

Recommended Posts

Hey guys,

Im on the verge of having my RB26 rebuilt, so after calling numerous workshops (local and interstate) and after being given lots of different quotes i'm still undecided as to which workshop to use.

I was quite happy with the quote I was given by Adelaide Engine Developments, but haven't heard much about them prior to finding them in the yellow pages.

Basically im just wondering has anyone here had work done by them?

Any input would be muchly appreciated.

Link to comment
https://www.sau.com.au/forums/topic/242797-rb26-rebuild-advice/
Share on other sites

  • Replies 40
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

I've recently spoken with Lewis engines and quite happy with their knowledge and development with the RB.

Fairly reasonably priced also.

http://www.lewisengines.com.au/

- http://www.lewisengines.com.au/category9_1.htm

Unsure why the rb26 rebuild is worth so much more than the rb25/30 rebuild.

As bodgy as it may appear I had my 30 bottom end built up by City Dismantlers.

They checked the motor out and then gave a solid quite. Didn't go over by $1. Less than 3 weeks later the motor was completed, strapped to a pallet wrapped up nicely.

gallery_382_2658_12249.jpg

All up back then inc. all the usual line bore (crank), forged pistons, rod resize, block & rod crack test, forged pistons, grub screw & king bearings cost me 3.9k to also fit the head and drill/tap the upper tensioner position.

Motors been good, always made good power and has done 100,000km's so far. :D

The same things done to the motor from Miltons they wanted 6.5k :S

Main reason I went with City's is the bloke who was in charge back then (Andrew) was able to answer any question I threw at him without hesitation. He had a history in speedway since a young kid and built many a few tough vlt's back in the day so he knew all the little tricks to perform with them.

They had what looked like new machinery, workshop was clean and organised. Some of the places I checked out I wouldn't be suprised if they lost bits. :S

Either way fixed price with no umm's or arr's, clean workshop, organised and the bloke was able to answer questions others were not able to won me over. ;)

Thats exactly why i'm leaning towards Adelaide Engine Developments, i've only had a chat with them over the phone.

But the guy I spoke to knew exactly what the go was, apparently they've done quite a few RB26 in the past, and the quote was... a fraction of some others I have received. :D

I'll be checking out their facilities next week

Edited by Tommmo

John moyle on main nth rd blair athol, is who built mine.

and remember the guy you talk to on the phone is normally just a salesman.

you need to talk one on one with the engine builder himself.

Dave at john moyle has been building, and dynoing speedway engines for nearly 40 yrs.

awesome price, awesome work, and a engine dyno if you want to run it in beforwe you install it.

highly recomended

places like bdt dont have a machine shop, so your paying for a middle man.

i dont see the point.

ill build ya stinker

i had chris miltons

do all the machine work on my 30det and i did all the assembaly etc .

made over 364rwkw on 18psi cost me less than $3500 to do the bottem end !

in the process of building another 30det to back up the fact i make killa motors

AED are decent, build HEAPS of big hp v8 motors, and jobbie works out of there (head porter). They would have a solid base to work from building a RB26. Could even tune and run in on the engine dyno if you desired. I would recommend also, tony knight engines and john keen for engine assembly. I know a guy building a LS1 stroker now, and is trying out lewis engines machining now, as we are getting sick of the pricing from rhemacs.

Cheers

troy you may be very well qualified to do engine assembly but it's amazing how many others think they can, and all they do is push brgs in, add a dob of oil, drop the crank in and torque to specs without using inside & outside mic's to check clearances, without checking endfloat, without checking for brg crush and even chipping the edges off scraper & segmental oil rings while pushing them into the bores. Just because the crank's been ground doesn't mean you don't still check everything.......9 times out of 10 main tunnels don't need line boring unless a brg has turned or been hammered.........that's why we do all the above checks.

Hence why it's a good idea to get the engine reconditioner to also assemble unless your a qualified mechanic or engine reconditioner IMO, so +1 dangerman4

thanks for the feedback guys, can someone pm contact details for John moyle.

Cant hurt to get another quote :(

John Moyle Motor Engineering

1a Collins St, Enfield, SA 5085

p: (08) 8269 3214 f: (08) 8344 1202

i supplied all the parts and they did all the machining and assembly of the short motor,

i suggest you do the same, as you know what parts you want and they know how to fit them.

ie rods , pistons, crank collar etc.

Once again thanks for the feedback, but i've decided to go with Adelaide Engine Developments. The guys there were very easy going, quick to answer all my questions and brought up issues I hadn't previously considered. The wokshop (be it small) is also quite well setup.

Engines being pulled out and tuesday! Looking forward to the whole build, hopefully there's not too many hickups!

thommo was the blokes name from adelaide engine developments name chris smith???? i beleive him and his mate run that business i work with chris up here and hes apparently good hes going to do a bit of my new motor im getting.

cheers... michael

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • Yep, totally get that. However hooking in for Generator back up is only a few hundred bucks for the wiring. You could put a couple of those in (for different circuits explicitly) and run a couple of baby generators. Bonus, you can balance them across different circuits, and now have backups in your backup. I'm looking at buying places that won't even have water etc, and I don't mind the idea of getting off the electric grid either, even with everything you've said. This country already has enough power outages that even the mains grid isn't that reliable anymore. I do agree though on spending a bit more to get better gear, and to add some extra redundancy in to the system too.
    • You can set hard reserves on your battery system, and it can't be discharged past that.  
    • That sounds like an excellent idea. But total self-sufficiency means exactly that. You have no-one else to blame when your system faults out and you have no power for a week or two while it gets fixed. You'd have to go the whole hog and get a diesel genny and all the switchover gear, to get you through such times. And, despite the fact that over 20 years, my system has been pretty reliable**, I have seen so many inverter explosions (or less dramatic deaths), panel and roof JB fires, and so on, over that time, to know that the stuff is the same as any other bulk Chinese manufactured stuff. The failure rate is well above zero - both on the equipment and on behalf of the meth addled installation labour force. And then..... warranty and means of redress against the supplier you bought the gear from. Best I can tell is that only a handful of solar companies are still around within 5 years of starting their advertising pitch. They disappear and phoenix like crazy. So, as per 1st paragraph, I suspect the only way to is go balls deep and spend maybe 2-3 times as much as you might think, so that you have every base covered. Plus, know and understand your gear intimately, so you can diagnose problems, sort them out yourself, etc, etc. Plus, probably have to consider upgrading various parts as the years pass, to maintain compatibility with newer stuff, performance and reliability, etc, etc. Whereas, remaining attached to the grid has an ongoing cost that keeps going up even if you use bugger all power from it. But it does provide the fallback in case of the worst case with your own gear. You either pay up front or as you go, I suspect.
    • Add more solar panels to the array. Call the electricity company and tell them you're moving out... Live off grid electric wise
    • Hi Jasmine. How's the war going?
×
×
  • Create New...