Jump to content
SAU Community

Recommended Posts

In my opinion, I would rather do something I am 100% happy with and enjoy, even if it did pay 2/3, over something that stresses me or makes me unhappy 3/3 salary.

100% happy and being paid 3/3. I'm not moving any time soon.

+1

My job has varied so much in the 10 years, its never gotten boring. Sure I lock horns with the business owners from time to time, but we're professionals and we all know its in the best interests of the business. Just like this new bill system upgrade we got ... I was against it claiming there would be problems, sure enough the system has caused many dramas already. But I don't complain, I find a solution and the bosses are happy. Bring on my performance review! :ermm:

I have regular "business status" meetings with the bosses weekly (such as this morning) which I find boring tho. :)

  • Replies 14.2k
  • Created
  • Last Reply

Top Posters In This Topic

Hmm, can't seem to find any place that sells holesaw kits for my intercooler piping. Been to Bunnings, Autobarn, Repco, Supercheap, and many others. Who the hell sells such a thing that I consider a simple tool? Might just do it the traditional way and mark out the circle using a suitable cup size and drill out the circumference!

Fitting new piping kit this weekend :ermm:

Hmm, can't seem to find any place that sells holesaw kits for my intercooler piping. Been to Bunnings, Autobarn, Repco, Supercheap, and many others. Who the hell sells such a thing that I consider a simple tool? Might just do it the traditional way and mark out the circle using a suitable cup size and drill out the circumference!

Fitting new piping kit this weekend :ermm:

hey mate, try Heatley Tools South Rd Wingfield.

hey mate, try Heatley Tools South Rd Wingfield.

use a compass, then drill it out with a suitable bit for a air saw blade to fit thru, two second job, then line it with a proper trim molding to prevent rub thru

air saw will go thru it like a hot knife in butter

On another note, who here actually enjoys thier job? Am I considered weird for actually enjoying what I do?

lol. i f**king hate my job. work shit hours, earn shit pay, cop it from some of the worst civilised society has to offer, and generally spend most of my time being stressed out. its awesome.

meh, new start in a couple years time if/when i come back, ill worry about doing something i enjoy then.

Hmm, can't seem to find any place that sells holesaw kits for my intercooler piping. Been to Bunnings, Autobarn, Repco, Supercheap, and many others. Who the hell sells such a thing that I consider a simple tool? Might just do it the traditional way and mark out the circle using a suitable cup size and drill out the circumference!

Try Total Tools, Cormack rd at Wiingfield

http://www.totaltools.com.au/icat/index.php?id=H

Fitting new piping kit this weekend :(

Wish I was too :)

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • Wanted to add some of my R33 GTST  R34 GTR wheels, 18x9 ET30 with 255/35/R18 PS4S'   BBS RE-V7 029 18x9.5 ET22 with 255/35/R18 PS4S' Needs a bit of camber   
    • Lamb roast on Saturday will be different 🥲
    • They are under bucket shims. Tomei provides a test shim kit and then any measurement of shim required. 
    • I always wondered how you were supposed to buy a set of 24 buckets and somehow magically have every single one of them yield exactly the desired clearance. I would have thought you'd need to assemble a cam with either 12 "sample" or "example" buckets of known top thickness (or a single such sample/example 12 times over!!) measure clearances at every valve, and then do the usual math to work out what the actual "shimness" of each bucket needed to be, before buying the required buckets to make up he thicknesses that you didn't have on hand.
    • I now seem to be limited in power due to my rev limit/hydraulic lifters in my built RB25. I'm looking into converting over to Tomei solid lifters. Question for anyone that has done the conversion. I was always under the impression that when using the Tomei solid lifter conversion, you would also require new valves (Longer or shorter stems, I can't remember which).  I don't know where I got this idea, as so far I see no mention of this in any of the Tomei documentation. It just states I need the Tomei solid buckets, solid lifter cams and upgraded springs. As my head is already built, all I would need is another set of 1000$ Kelford cams, 500$ buckets and about 4H hours of my time installing and I'm off to the races!?!? There's no way it's that simple, I must be missing something? 
×
×
  • Create New...