Jump to content
SAU Community

Recommended Posts

  • Replies 103.8k
  • Created
  • Last Reply

Top Posters In This Topic

  • GTS-t VSPEC

    20904

  • Nizmo

    13582

  • SHUTO-BOY

    6636

  • skyzerr33

    5353

Ever see that show on mad tv "lowered expectations"

Bah dont value ureself based ont he fact ure single, single is good. I know the last thing i need is a girl to stress about. Im a man in my own right , ooooohhhhh yeh. Do as i please when i please and dont owe nobody nuffin:D

haha I battle to get out of Slakos workshop when i do go there "Tim wheres my car?" ....."Hey just let me show you what ive done to this ..... " (insert whole rebuild here) ...."thats great now where is my car" ..... "oh did i tell ya about this wanker that came in here the other day" ..... finally get around to my car haha then he goes into every single detail of what he's done ..... which is cool - then tells me im not driving it hard enough :D

So i dont feel the need to go in there every single day/week haha cos i probably would never get out of the place :D

hahah Dan it was Temptation Island ....... Tasmania style :D

Boosty ..... sometimes it bothers me .... sometimes it doesnt ..... haha come summer it wont .... i have heaps of fun in summer when im single .... partaying season!! :D

BamBam ..... your local dodgy travelling salesmen :D

Well i would be buying more but my bank account is still trying to recover from holidays ....... but once it has ..... im visualising lotsa goodies for my car :uh-huh:

Actually might try and get a new exhaust for Xmas :D or i might push my luck and see if i can go the full guilt trip on the folks for the second Xmas in a row they've left me by myself and as for an intercooler :D

haha ive just done the middle of the desert thing ..... got friends in Melbourne i can stay with but one is considering a road trip up north of Vic for fruit picking over Xmas (weird Vics!!)

Was going to go over East but i need money .... n perth is good in summer. Last year was cool - worked from 8am til 1pm .... come home and spend the rest of the day in the pool! :D

See i dont know whats happening with my job so i cant say .... i'll go on a holiday ..... because i may be out of a job in 3 weeks and will need that "holiday money" to keep myself alive til i get something else.

Guest
This topic is now closed to further replies.



  • Latest Posts

    • Food for thought, the stock oil filter thread is a 3/4-16 UNF, which has an ID of about 10 to 12mm (according to ChatGPT lol). Now compare than to an 10AN, which has an ID of about 14mm (Raceworks is 14.2mm, Speed flow is 14.27mm).  
    • Yep, totally get that. However hooking in for Generator back up is only a few hundred bucks for the wiring. You could put a couple of those in (for different circuits explicitly) and run a couple of baby generators. Bonus, you can balance them across different circuits, and now have backups in your backup. I'm looking at buying places that won't even have water etc, and I don't mind the idea of getting off the electric grid either, even with everything you've said. This country already has enough power outages that even the mains grid isn't that reliable anymore. I do agree though on spending a bit more to get better gear, and to add some extra redundancy in to the system too.
    • You can set hard reserves on your battery system, and it can't be discharged past that.  
    • That sounds like an excellent idea. But total self-sufficiency means exactly that. You have no-one else to blame when your system faults out and you have no power for a week or two while it gets fixed. You'd have to go the whole hog and get a diesel genny and all the switchover gear, to get you through such times. And, despite the fact that over 20 years, my system has been pretty reliable**, I have seen so many inverter explosions (or less dramatic deaths), panel and roof JB fires, and so on, over that time, to know that the stuff is the same as any other bulk Chinese manufactured stuff. The failure rate is well above zero - both on the equipment and on behalf of the meth addled installation labour force. And then..... warranty and means of redress against the supplier you bought the gear from. Best I can tell is that only a handful of solar companies are still around within 5 years of starting their advertising pitch. They disappear and phoenix like crazy. So, as per 1st paragraph, I suspect the only way to is go balls deep and spend maybe 2-3 times as much as you might think, so that you have every base covered. Plus, know and understand your gear intimately, so you can diagnose problems, sort them out yourself, etc, etc. Plus, probably have to consider upgrading various parts as the years pass, to maintain compatibility with newer stuff, performance and reliability, etc, etc. Whereas, remaining attached to the grid has an ongoing cost that keeps going up even if you use bugger all power from it. But it does provide the fallback in case of the worst case with your own gear. You either pay up front or as you go, I suspect.
    • Add more solar panels to the array. Call the electricity company and tell them you're moving out... Live off grid electric wise
×
×
  • Create New...