hey fella's, basicly i'm a boilermaker by trade, have worked on quite a few high profile jobs, the new docklands ferris wheel is one, repairs on the MCG retractable roof, desalination plant and working in power station boilers, after abit of interested in what i do in the wasteland i thought i might post up a few pic's on what i'm doing at the moment.

basicly i'm "spooling" and welding pipe for ESSO, an offshore gas company with 20 odd rig's in the bass strait, the pipe's on these rig's are replaced every 10 year's for safety reasons, so we're making up some new pipe, we welding with TIG for the smaller stuff under 120mm nominal bore (inside diameter of the pipe) and under 8mm wall thickness, anything bigger and we use a special MIG machine made by lincoln weld called an STT (surface tension transfer), basically it pulses the amperage from a lower background setting, to a high peak, the idea being to be able to weld faster then with a stick welder (which is the old hat way of welding big pipe) but with much lower heat input then a MIG as well as almost zero spatter, excesive heat input will cook the aditive's out of the steel making it brittle and prone to cracking, so weld procedure's are strictly adhered to.

these baby's are worth 14k each without a wire feed unit

P1090604.jpg

and another 3k per wire feed

P1090605.jpg

this is an STT weld on the 300mm pipe, the weld's on the 80mm branch are done with TIG

P1090607.jpg

this is the machine we use for TIG, they made by fronius and are worth around 9k each, they do standard and pulse MIG (they pulse from full power to nothing, unlike the STT which pulses from full power to background power, so these are no good for the pipe weld's) TIG welding and stick, and you need to be able to fly an F16 fighter jet to set them up, over 100 separably adjustable parameter's

P1090609.jpg

this is a spool we knocked up in about 8 hours (tacking, not welding), this one bolt's to the header of a compressor, the upright section's with the flanges are 200mm nominal bore pipe with a 12.7mm wall, these are not allowed to be drifted into place when being installed due to vibration issue which can damage the 5 million dollar compressor, so the tolerance once welded has to be spot on, each weld shrink's around 2-2.5mm when welded depending on the root gap which has to be taken into account during fabrication, the section at the front with 6 weld's will shrink 14mm after welding, talking about those flanges, the clamping face is 110mm thick 1.25% cro-mo steel, each flange has 20 38mm high tensile bolts tightened to 1200 NM each, clamping force is 16 tones per join.

P1090606.jpg

this is what we use to cut the pipe to length and bevel then at the same time, the procedure for this job is a 25 degree bevel on each side of the weld

P1090608.jpg

a few completed spool ready to weld

P1090610.jpg

as the pipe's need to hold 1700 PSI of pressure, and the content's is natural gas making it incredibly dangerous if a weld fails while the gas rig is in operation each weld is gammer ray tested and X ray tested to detect imperfection's in the weld metal such as porosity, inclusions and lack of fusion, each test cost's around $1000, we weld these on a "butt rate" which means we get paid per weld, with any repair's getting completed in our own time and we cover the cost of the extra gammer and x ray, we get $120 per weld, and a good welder can do a weld in 35 minutes, good welder's get in 15 a day

There's a good chance that we supplied the pipe and fittings for this.

I'm a bit surprised at the unprotected RF's on the weld necks, you guys must be good at keeping things separated (unlike some peanuts out there).

It's good to see you're proud of your work, well done.

That machine, which I assume is an oxy torch for pipes looks AWESOME!

Everything else is pretty darn cool, especially knowing how much you're going to shrink a pipe by!

dead on thumbsup.gif just an oxy with a swivel head for the bevel and the chain and gear arrangement to keep in traveling around the pipe, worth around 2k it's amazing how much some of these thing's cost

There's a good chance that we supplied the pipe and fittings for this.

I'm a bit surprised at the unprotected RF's on the weld necks, you guys must be good at keeping things separated (unlike some peanuts out there).

It's good to see you're proud of your work, well done.

if that's the case then tell whoever machines the bloody things we only want 1mm landing on the flanges, grinding to back is a pain in the ass

if that's the case then tell whoever machines the bloody things we only want 1mm landing on the flanges, grinding to back is a pain in the ass

As we're a distributor, we have to take what's given to us. Special requests bump up the costs somewhat and it's not something that our customers wish to bear.

What this means unfortunately is that you, the fabricator, have to use your magic touch to make things right.

The only people who get what they want is Woodside, but believe me, they pay for it. Just one of the fittings (header tank with 4 test rings) that passed through my projects warehouse last week cost them over $180k, including air freight and testing.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • This. A 3d wheel alignment is like $120...just take it to the shop. Since theres probably multiple adjustments that need to be made after changing something. Mine has front/rear lower arms, traction rods, tension rods, camber arms, toe arms, front upper arms, hicas kit, sway bars and coilovers. I measure from the edge of the bolt holes on the originals and set the same length on all the adjustable stuff to dial it as close as I could to OEM. Took it straight for alignment; it didnt feel right at all...after alignment, it feels perfect. Similarly i've just changed the springs on another car; and I still needed multiple adjustments to bring it back in spec.
    • A full Veilside kitted JZA80 Supra in Meriken park in Kobe city a few weeks back
    • Its a well known brand in New Zealand; its a rebrand of the Rhino RAV3.  I don't know what the wiring difference *is* between the rev.1 (installed about 15 years ago) and rev.2; but as you say I would think its reasonable that it uses the same immobiliser relay circuits. I had a look but couldnt see a similar harness; but didnt move things around since I didnt want to mess with it   It was one of AVS well known Authorised Installers; I spoke to AVS themselves about it but theyre unsure hence seeking advice more so from the skyline community who are more familiar with the actual car and its wiring. Im in Auckland; but the installer is on the other side of the city so hes very reluctant to come back to even look at it to confirm something isnt connected into the wrong wire.  I dont want to drop the name since they *did* do a really good job for the most part. Everything is very tidy and he fully replaced all the alarm wiring, all the sensors, the wiring to the door motors, installed a switch which was never installed in the first place...really happy with the alarm install itself..just not this one issue. We all make mistakes, if it is the alarm, I just want my fuel pump getting proper switched, fused, power as it was; without having to shell out for an auto electrician to switch a wire and tell me it was the alarm. 
    • Even with the piston at TDC there was room for it to drop, but I don't think it can drop fully into the cylinder, the problem you have is that you need something pushing against the valve to hold it up so you have enough room to put the new stem seal on and the spring etc.  I used compressed air only because putting rope in the cylinder seemed a bit risky to me, I know people have done it countless times before like this. Overall it's a pain in the ass job. Honestly you'd probably be better off taking the head off because the risk of dropping something in the engine and the finicky-ness of it all is very stressful. If you are going to attempt it though i 10000% recommend a 36050 valve spring/keeper tool. I had both the traditional lever type and after doing 1 cylinder it was absolute pain to get those valve keepers in place, even with 2 people. That 36050 is amazing, you do have to push hard to get them in place but it works perfectly almost every time. Back to my actual issue I think my engine is just tired and old and the rings have gone bad. The comp numbers (cold, no oil) were: Cyl 1 -129psi Cyl 2 - 133psi Cyl 3 - 138psi Cyl 4 - 137psi Cyl 5 - 157psi Cyl 6 - 142psi   Cylinder 5 and 6 having the most carbon on them.
    • Who did you have do the installation? I actually know someone who is VERY familiar with the AVS gear. The main point of contact though would be your installer.   Where are you based in NZ?
×
×