Jump to content
SAU Community

Recommended Posts

I'm about to source some big end and main bearings for my RB26.

I have 4 options:

* Genuine Nissan mains and big ends (not likely as the big ends are too soft)

* NISMO (Good, becasue they are graded and I can easily get the clearance I want and supposedly good bearings)

* Tomei (similar price to NISMO).

* ACL Race

I'm probably leaning towards the ACL race bearings becasue of price.

Has anyone used these?

The other thing is that I will be using a brand new crank, are the clearances likely to come out okay withe the ACL bearings given that they aren't graded?

If they are too small, I can always lenish the crank a little, but what if they are too large?

While I'm at it, I'm planning to run about 0.00125" - 0.00150" clearances. How does that sound?

Thanks in advance

Link to comment
https://www.sau.com.au/forums/topic/89141-engine-bearings-for-rb26/
Share on other sites

I'm using King bimetal high performance. Fairly well priced as well.

The builder was able to get them for cheaper than the nismo items.

+ he had used king with success in the past.

I've done 20,000km's so far. :(

Edited by Cubes

Another vote for King here... have used NK (I think it was NK...) bearings before who make them for Nismo... tri-layer style bearing. After 10,000kms with no detonation one was pretty worse for wear and on its way to picking up/spinning.

Put King's in and have done another 20,000kms and no problems what so ever.

I've heard bad reports of using tri-metal style bearings in hipo rb30's from the VL turbo boys, we are talking up over 300rwkw though.

An RB is an RB. :(

Forgot to mention im making over 300kw at the wheels (2530's). The Nismo bearings according to two engine builders I spoke to are tri-layer bearings produced by NK (Im pretty sure the company name is NK, cant remember 100% off the top of my head though).

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • For race cars, this is one part where I find having the roll cage bar having gone through a hole in the floor better than the build it up on a ledge inside... The Merc I help on, the main hoop ends are marked on the car, and the jack is marked... Jack goes under a few inches and lifts one whole side of the car up... Removes that fight for long slim jacks for race car duties!   My biggest issue for the daily drivers I work on, is my jacks don't go high enough. The jacks start out on a few blocks, jack it up, then start a second jack under it on more blocks, and then I can get an axle stand under it. My axle stands are presently in use, and are nearly fully extended. The car is sitting with barely more than a cm of clearance to get the wheel off the studs! Sarah's Kluger is the same, as it has an ungodly amount of droop available in the suspension and a distinct lack of good jacking points!
    • Happy? Yep, my to do list is getting shorter and shorter. Either this light approaching is the end of the tunnel, or I'm about to be hit by a train... Ha ha ha   Also, Duncan isn't that far out of town that you need to make a multi day drive out of it. 😛
    • Sorry I meant that we are building the EH for a client.
    • LOL, when one "money pit" is never enough Noice, and excellent work mate
    • I have more than enough digging, laying blocks, moving gravel, airrating, feeding and top soiling the grass, and setting up the veggie gardens growing some seedlings,  and then removing all the unused rock to keep me busy for the next few months at least,  hopefully the rain stops soon so I can get a few hours in this arvo, but, before that Sunday is washing day, is every body happy, you bet your life we are Nice country road day drives are a day off whenever I'm muscle sore from all the landscaping at the moment, but, more epic multiple day drives will start once the majority of the big jobs outside are completed
×
×
  • Create New...