Jump to content
SAU Community

Recommended Posts

am wrecking a 90 R32 Gtr

will put up a list of buyable parts once i pull them off

until then hit me up and ill let you know if i can get the part

Location is Central queensland

Parts being held

Attesa oil pressure switch

pod filters and necks

A/C surround

rear speaker covers

boot trims

rear seats

drivers side seat belt assembly

steering wheel

AC centre vent

boot lid

rims and tyres

roof lining

front calipers + discs

diff

damage is to Passenger side wheel area most of the rest of the car is ok hope that will do for viable parts list

please all inquires via PM

also im working 12 hour shifts for approx 2 weeks longer so bare with me might take a little time for things to go along smoothly

Cheers

RellikZephyr

Edited by RellikZephyr
Link to comment
https://www.sau.com.au/forums/topic/171597-wrecking-32-gtr/
Share on other sites

All PM replied

sorry have been rather busy

please all queries via PM makes it bit easier (wasnt expecting so many queries so quickly)

ok parts being held

Attesa oil pressure switch

pod filters and necks

A/C surround

rear speaker covers

boot trims

rear seats

drivers side seat belt assembly

steering wheel

AC centre vent

Location is Central queensland for those that asked

am replying to all posts now via PM

sorry for lengthy replies

RellikZephyr

Link to comment
https://www.sau.com.au/forums/topic/171597-wrecking-32-gtr/#findComment-3166989
Share on other sites

all replies responded to via PM

sorry for slow replies

12 hr shifts 6 days a week and night shift stupid shut downs

almost finished approx 2 weeks more

but got this week end off so i will get into it for all parts being held

Thanks for your patience

RellikZephyr

Link to comment
https://www.sau.com.au/forums/topic/171597-wrecking-32-gtr/#findComment-3167036
Share on other sites

Guest
This topic is now closed to further replies.


  • Similar Content

  • Latest Posts

    • That sounds like an excellent idea. But total self-sufficiency means exactly that. You have no-one else to blame when your system faults out and you have no power for a week or two while it gets fixed. You'd have to go the whole hog and get a diesel genny and all the switchover gear, to get you through such times. And, despite the fact that over 20 years, my system has been pretty reliable**, I have seen so many inverter explosions (or less dramatic deaths), panel and roof JB fires, and so on, over that time, to know that the stuff is the same as any other bulk Chinese manufactured stuff. The failure rate is well above zero - both on the equipment and on behalf of the meth addled installation labour force. And then..... warranty and means of redress against the supplier you bought the gear from. Best I can tell is that only a handful of solar companies are still around within 5 years of starting their advertising pitch. They disappear and phoenix like crazy. So, as per 1st paragraph, I suspect the only way to is go balls deep and spend maybe 2-3 times as much as you might think, so that you have every base covered. Plus, know and understand your gear intimately, so you can diagnose problems, sort them out yourself, etc, etc. Plus, probably have to consider upgrading various parts as the years pass, to maintain compatibility with newer stuff, performance and reliability, etc, etc. Whereas, remaining attached to the grid has an ongoing cost that keeps going up even if you use bugger all power from it. But it does provide the fallback in case of the worst case with your own gear. You either pay up front or as you go, I suspect.
    • Add more solar panels to the array. Call the electricity company and tell them you're moving out... Live off grid electric wise
    • Hi Jasmine. How's the war going?
    • I'm extremely suspicious of the VPP stuff. Best I can tell, you surrender any and all control of your panels and battery to the VPP, because there's no way that anyone could write a sufficiently useful set of "rules" as to how much you would be willing to let out of your export meter at any given time. If one of your main interests is to have enough in your battery every evening to get you through the night without having to import, you could easily find yourself with nothing in your battery at the end of the day, or part way through the night, and then be paying import pricing instead of paying nothing. I cannot see how this cannot come to pass.
    • majority aftermarket is an10 yes, but majority of OEM is An12 r35 OEM cooler lines at close to an 12, the hard line that car uses is almost 20mm  Porsche OEM is also AN12   i figure, if our power levels are close to 1000hp, then AN12 should be a must if many OEM standard power vehicles use AN12
×
×
  • Create New...