Hi all,

I am hoping to get some information/advice. We have two weeks to get our slab down to qualify for the first home owners grant and nothing has been started. Is it at all possible to have the block cut out and slab down before 17th of may or are we going to have to get tough and take legal actions to cover us? I am hoping there may be a few of you who work in the industry. I will not publicly name the builder as i do not want anything to come back on us.

Thanks in advance i hope

Link to comment
https://www.sau.com.au/forums/topic/268387-has-anyone-had-building-experience/
Share on other sites

i havnt heard of this getting the slab down crap before may stuff. my first home buyers grant was applied to the land already i beleive.

but my slab still hasnt been laid either, jeez maybe ill have to look into that scary stuff

----------------------------------------------------------

Have all the applicants either -

a) on or after 1st July 2000, entered into a Contract for Sale and Purchase of a home?

or;

b) on or after 1st July 2000, entered into a comprehensive home building contract?

or;

c) on or after 1st July 2000, in the case of an owner builder, commenced construction (ie. laid foundations) of a home on their vacant land?.

------------------------------------------------

http://www.revenuesa.sa.gov.au/

dare say that means you just need a contract for it, where you hear about laying the slab

Edited by Inline 6

I have spoken with revenue SA and when you sign the contract it states that building needs to commence in 26 weeks of that contract (slab being down). You then need to email revenue sa with all details as to why it wont be down. Then you may be considered for an extension. We have been pushing this for the last 6 -7 weeks and not getting anywhere

^^^ Correct, you have 6 months in which to lay the slab after signing the contract, else no FHG.

I was under the impression there were no exceptions, but that may have changed since we built.

FYI we laid the slab 3 days b4 the 6 months was up - we had to pressure the builder flat out. In fact, they poured the slab on Jan 3rd 2002, which was a 36 degree day (hence they started at 5am and were gone by 10am), and most tradies take the whole of January off (and certainly don't ordinarily work that close to Xmas).

So in answer to your question, yes they should easily be able to do it within 17 days (physically).

In fact, it should only take 3 days -

1 day to cut/fill and dig the footings trenches. Maybe an extra day if you need masses of cut.

1 day to lay the steel reinforcing and plumbing

1 day to pour the slab.

But whether the builder has the spare tradies and equipment to do it before your date is another story.

Good luck - and welcome to the nightmare of building. I just pray you aren't building with Rossdale or AV Jennings ....

Thanks Nightcrawler, we are not with either of those builders. We have a reasonably flat block at aldinga, it is just a single pour. We have have now sent emails and my lovely partner is hounding them. It is hard to know when they are full of crap not knowing alot about building. Hopefully when my partner gets home we will have some better news as 'apparently' at 4.40pm this afternoon they were having a meeting regarding us. I wonder why my ears are burning lol. I will be keeping my fingers and toes crossed.

I built a brick barbecue once......actually its still standing and can take my bodyweight....

Nice contribution there Nugzy :D

Mel, keep hounding them. Chances are, they are not meeting to discuss you. I've heard bullshit like that before. Delay tactics. Tell them you want a copy of the minutes arising from that meeting. If they can't provide, then it never happened. Threaten to get in contact with HIA and see if that rattles their cage.

Your first step to preparing yourself "for combat" is always to be aware of who it is you'd need to complain to in the event of a dispute. In this case, I believe HIA are the people. Call them and just briefly tell your story and what they think you should do. No action needs to be taken now, but they could prob guide you to get better results.

I deal with builders, developers, brokers, agents on a regular basis, and they're as trustworthy as a car salesman. :D

I'm in the middle of taking action against my Broker for not following specific instructions on how I wanted my property portfolio structured ... they've come to the table panicking because I've been armed with good advice from the COS, and I know the rules involved. Get yourself armed with good reliable info.

Edited by RubyRS4

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • Yup. You can get creative and make a sort of "bracket" with cable ties. Put 2 around the sender with a third passing underneath them strapped down against the sender. Then that third one is able to be passed through some hole at right angles to the orientation of the sender. Or some variation on the theme. Yes.... ummm, with caveats? I mean, the sender is BSP and you would likely have AN stuff on the hose, so yes, there would be the adapter you mention. But the block end will either be 1/8 NPT if that thread is still OK in there, or you can drill and tap it out to 1/4 BSP or NPT and use appropriate adapter there. As it stands, your mention of 1/8 BSPT male seems... wrong for the 1/8 NPT female it has to go into. The hose will be better, because even with the bush, the mass of the sender will be "hanging" off a hard threaded connection and will add some stress/strain to that. It might fail in the future. The hose eliminates almost all such risk - but adds in several more threaded connections to leak from! It really should be tapered, but it looks very long in that photo with no taper visible. If you have it in hand you should be able to see if it tapered or not. There technically is no possibility of a mechanical seal with a parallel male in a parallel female, so it is hard to believe that it is parallel male, but weirder things have happened. Maybe it's meant to seat on some surface when screwed in on the original installation? Anyway, at that thread size, parallel in parallel, with tape and goop, will seal just fine.
    • How do you propose I cable tie this: To something securely? Is it really just a case of finding a couple of holes and ziptying it there so it never goes flying or starts dangling around, more or less? Then run a 1/8 BSP Female to [hose adapter of choice?/AN?] and then the opposing fitting at the bush-into-oil-block end? being the hose-into-realistically likely a 1/8 BSPT male) Is this going to provide any real benefit over using a stainless/steel 1/4 to 1/8 BSPT reducing bush? I am making the assumption the OEM sender is BSPT not BSPP/BSP
    • I fashioned a ramp out of a couple of pieces of 140x35 lumber, to get the bumper up slightly, and then one of these is what I use
    • I wouldn't worry about dissimilar metal corrosion, should you just buy/make a steel replacement. There will be thread tape and sealant compound between the metals. The few little spots where they touch each other will be deep inside the joint, unable to get wet. And the alloy block is much much larger than a small steel fitting, so there is plenty of "sacrificial" capacity there. Any bush you put in there will be dissimilar anyway. Either steel or brass. Maybe stainless. All of them are different to the other parts in the chain. But what I said above still applies.
    • You are all good then, I didn't realise the port was in a part you can (have!) remove. Just pull the broken part out, clean it and the threads should be fine. Yes, the whole point about remote mounting is it takes almost all of the vibration out via the flexible hose. You just need a convenient chassis point and a cable tie or 3.
×
×
  • Create New...