Gearbox in. R32 auto Tailshaft getting chopped up and R33 yoke fitted. Opted to go with the 2 piece as I've heard nothing but dramas from 1 piece setups. Started mucking around with the intake pipework setup, decided that a blow off was too much bother.. ahh the joy of MAP tuning.

Getting close to the great wire up, OEM coilpacks are now only AUD330 delivered and for the loom, you can just buy the plugs if you are going aftermarket loom for your ECU!

Having a few dramas with the power steering setup, seems like every RB has a different orientation of the pump depending on AWD, HICAS and model. Getting the combination wrong means either the pump doesn't fit or it is positioned to far back or forwards for the drive belt. Going to try a 26 bracket with 25 non-hicas pump, fingers crossed.

Also learnt that the heater core piping is much smaller diameter between each model, thus, you will need the water fitting from an RB20 to fit up the heater setup without mucking around. This is tricky to get off and requires a 27mm deep socket to get off easily. Be warned, it is very easy to round the fitting with a spanner even with the engine out of the car.

In any case, feeling the progress now, mostly because ACE workshop is doing such awesome work :).

  • 2 weeks later...

Didn't even know they were an option to be honest. They don't look *that* much cheaper for the extra work but given that I already have a set of OEMs I guess i'll keep it in mind if any fail me.

Still arguing with powersteering. Trying a Neo bracket and pump now because all the 20/26/25 combinations we tried didn't work.

  • 3 weeks later...

Just a little update.

The race between my first born and this car is currently neck and neck, however, I think sportsbet has odds on baby to win :(.

The trust waste gate which wouldn't hold pressure. Ace Workshop pulled it apart and found a leaking rubber diaphragm and some horribly shoddy workmanship by a former owner.

Trust Wastegate Before

After some tender love and care it now looks like this:

Trust Wastegate After

I had the wonderful task of picking apart the RB20 loom for the wiper controls.

Before

RB20 Loom before

After

RB20 Loom after

I did manage to source a Neo powersteering pump after several false starts and it all bolted in without issue and lined up beautifully (except for being slightly bent, le sigh).

Most of the ancillaries are now connected with just a couple of bits and pieces to tidy up. After the intake is finalised, it's finally time to get wiring.

The engine bay currently looks like this:

Progress at 25/08/2014

Edited by Sarumatix
  • 2 months later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • You can set hard reserves on your battery system, and it can't be discharged past that.  
    • That sounds like an excellent idea. But total self-sufficiency means exactly that. You have no-one else to blame when your system faults out and you have no power for a week or two while it gets fixed. You'd have to go the whole hog and get a diesel genny and all the switchover gear, to get you through such times. And, despite the fact that over 20 years, my system has been pretty reliable**, I have seen so many inverter explosions (or less dramatic deaths), panel and roof JB fires, and so on, over that time, to know that the stuff is the same as any other bulk Chinese manufactured stuff. The failure rate is well above zero - both on the equipment and on behalf of the meth addled installation labour force. And then..... warranty and means of redress against the supplier you bought the gear from. Best I can tell is that only a handful of solar companies are still around within 5 years of starting their advertising pitch. They disappear and phoenix like crazy. So, as per 1st paragraph, I suspect the only way to is go balls deep and spend maybe 2-3 times as much as you might think, so that you have every base covered. Plus, know and understand your gear intimately, so you can diagnose problems, sort them out yourself, etc, etc. Plus, probably have to consider upgrading various parts as the years pass, to maintain compatibility with newer stuff, performance and reliability, etc, etc. Whereas, remaining attached to the grid has an ongoing cost that keeps going up even if you use bugger all power from it. But it does provide the fallback in case of the worst case with your own gear. You either pay up front or as you go, I suspect.
    • Add more solar panels to the array. Call the electricity company and tell them you're moving out... Live off grid electric wise
    • Hi Jasmine. How's the war going?
    • I'm extremely suspicious of the VPP stuff. Best I can tell, you surrender any and all control of your panels and battery to the VPP, because there's no way that anyone could write a sufficiently useful set of "rules" as to how much you would be willing to let out of your export meter at any given time. If one of your main interests is to have enough in your battery every evening to get you through the night without having to import, you could easily find yourself with nothing in your battery at the end of the day, or part way through the night, and then be paying import pricing instead of paying nothing. I cannot see how this cannot come to pass.
×
×
  • Create New...