Jump to content
SAU Community

Recommended Posts

Yahoo!

because mines an odd length, do you think i'd need to send it away to get it measured properly? or could it be done without sending it away?

i was wanting to do this when i was holding the one kris put in the Mines 34gtr out here it was quiet nice!

Yahoo!

because mines an odd length, do you think i'd need to send it away to get it measured properly? or could it be done without sending it away?

Or.................. *you* could measure it up? :ninja::)

For $2k landed, put me down for one (R32 GTR) if anyone is going to organise a group buy :)

:merli:

yeah i think i will pull it out today and get the woman to measure it up.. haha

a group buy is on order!! i'd organise it if we can get a few numbers!

ok

i've emailed them for prices on 10, 20 and 30.

Edited by Angus Smart
surely some people will want this?

maybe we can do a dyno test before and after carbon shaft.

there would be a difference correct?

No. Or atleast there shouldn't be. The only reason to record a difference would be if the dyno wasn't being set up or run correctly.

We will start manufacturing one peice carbon fibre shafts for the R32 GTR as soon as we have refined our custom made m300 yokes.

I didn't think there would be much of of a market in Australia for them....

Will post up details when production has started. about 2 months around 2,000 AUD. Higher spec then ATCP / Trust / rebadge / rebadge

Good for up to 1000HP 10,000 RPM

PM if you want more details

Rob

We will start manufacturing one peice carbon fibre shafts for the R32 GTR as soon as we have refined our custom made m300 yokes.

I didn't think there would be much of of a market in Australia for them....

Will post up details when production has started. about 2 months around 2,000 AUD. Higher spec then ATCP / Trust / rebadge / rebadge

Good for up to 1000HP 10,000 RPM

PM if you want more details

Rob

"We" being.......... who exactly?

Indicative time frame till production?

We will start manufacturing one peice carbon fibre shafts for the R32 GTR as soon as we have refined our custom made m300 yokes.

I didn't think there would be much of of a market in Australia for them....

Will post up details when production has started. about 2 months around 2,000 AUD. Higher spec then ATCP / Trust / rebadge / rebadge

Good for up to 1000HP 10,000 RPM

PM if you want more details

Rob

ok interesting.. yes Moar details!

the us dollar is looking pretty sweet right now Atcp may have our business!

wouldn't the map look more responsive with a carbon shaft installed?

No.

There are bundles of misunderstandings about light weight drive train components. Some people reckon they destroy the driveability & low range torque of a motor.

Others believe the low rotational inertia produces masses more acceleration.

What is true that if the lower drive train inertia isn't factored into the dyno readings it will give a false, high, output number.

Also true is that a lightweight driveshaft (much like its flywheel equivalent) will reduce the amount of energy (or horsepower over time if you like) required to accelerate the car. Whether this is important or significant depends on a bundle of factors. I would suspect that a good carbon drive shaft would have a small & perhaps measureable effect.

We being RAF Engineering.

WA based company.

Can't give exact date on production run start but should be with in 2 months total. I want to ensure full testing, safety and material QS are above what is currently avaliable.

NATA will be doing some of our final testing.

Website will be up in in 3 weeks.

We are also making billet / carbon fibre Lat links too.

Also as stated above Atcp will be a lower spec then the one we will producing.

Also we are a australian based company using australian made raw materials.

PM box is full send emails to [email protected]

ok interesting.. yes Moar details!

the us dollar is looking pretty sweet right now Atcp may have our business!

USD is actually pretty average at the moment. the AUD is going pretty well though (which I gather is what you mean?).

a carbon shaft will most likely have less effect than a lightweight clutch and flywheel. it's simple nerd talk. flywheel and clutch are large diameter out from the crank, which means any benefit of lightening way out there is multiplied. one of the gingerbeers on here can explain it more succintly i'm sure. but with the shaft being quite small in diameter the weight removed is not far out from that centre of rotation. the plus side is you do save a fair bit of weight.

and seriously I reckon 2 or 3 max would be in on this.

USD is actually pretty average at the moment. the AUD is going pretty well though (which I gather is what you mean?).

a carbon shaft will most likely have less effect than a lightweight clutch and flywheel. it's simple nerd talk. flywheel and clutch are large diameter out from the crank, which means any benefit of lightening way out there is multiplied. one of the gingerbeers on here can explain it more succintly i'm sure. but with the shaft being quite small in diameter the weight removed is not far out from that centre of rotation. the plus side is you do save a fair bit of weight.

and seriously I reckon 2 or 3 max would be in on this.

Does that make me a ginger beer or a nerd, Baron? Maybe both.

The term you are seeking is the polar moment of inertia. J for short. For a hollow round section

Polar moment of inertia = pi/32 multiplied by (outside diameter to the fourth power - inside diameter to the fourth power)

Anyway for a small increase in diameter you get a big increase in torque transmission capacity.

On the flip side the metal at the centre of the shaft is doing next to fk all.

Question to Syslink. Which NATA accredited mob are you getting to do your testing, not Metlabs by chance?

Edited by djr81

either way its still weight i want to get rid of as thats my main goal for now.

and on the plus side, single piece shaft rather than the current.

and barron, a light weight clutch/flywheel would be somewhere 5x (+++) the cost of the shaft correct?

either way its still weight i want to get rid of as thats my main goal for now.

and on the plus side, single piece shaft rather than the current.

and barron, a light weight clutch/flywheel would be somewhere 5x (+++) the cost of the shaft correct?

Most Jap branded twin plate clutches come with a "lightened flywheel", and will set you back approx $1500.

You can get a super-dooper carbon clutch and super-dooper lightweight unobtainium flywheel for upwards for $10,000 though.

Most Jap branded twin plate clutches come with a "lightened flywheel", and will set you back approx $1500.

You can get a super-dooper carbon clutch and super-dooper lightweight unobtainium flywheel for upwards for $10,000 though.

yeah i've got an OS unit now i'm sure its good, cost a fair bit

but yes the $10000 was more to what i ment in the previous post.

Edited by Angus Smart

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • OK, Step 3, if you need to remove the valve body, either to replace it, the TCM, or to do a more complete drain.  First, you need to disconnect the TCM input wires, they are about half way up the transmission on the drivers side. One plug and the wires are out of the way, but there is also a spring clip that stops the socket from sliding back into the transmission. On my car the spring clip was easy to get, but the socket was really stuck in the o-ring of the transmission housing and took some.....persuasion. You can see both the plug to remove (first) and the spring clip (second) in this pic Incidentally, right next to the plug, you can see where the casting has allowance for a dispstick/filler which Nissan decided not to provide. there is a cap held on with a 6mm head bolt that you can remove to overfill it (AMS recommend a 1.5l overfill). Final step before the big mess, remove the speed sensor that is clipped to the valve body at the rear of the box.  Then removal of the Valve Body. For this the USDM Q50 workshop manual has a critical diagram: There are a billion bolts visible. Almost all of them do not need to be removed, just the 14 shown on the diagram. Even so, I both removed one extra, and didn't check which length bolt came from which location (more on that later....). Again it is worth undoing the 4 corners first, but leaving them a couple of turns in to hold the unit up....gravity is not your friend here and trans oil will be going everywhere. Once the corners are loose but still in remove all the other 10 bolts, then hold the valve body up with 1 hand while removing the final 4. Then, everything just comes free easily, or like in my case you start swearing because that plug is stuck in the casing. Done, the valve body and TCM are out
    • OK, so if you are either going for the bigger fluid change or are changing the valve body which includes the Transmission Control Module (TCM), first you should have both a new gasket 31397-1XJ0A and a torque wrench that can work down to 8Nm (very low, probably a 1/4 drive one). You can probably get by without either, but I really didn't want to pull it all apart together due to a leak. First, you now need that big oil pan. The transmission pan is 450 long x 350 wide, and it will probably leak on all sides, so get ready for a mess. There are 24x 6mm headed bolts holding the pan on. I undid the 2 rear corners, then screwed those bolts back in a couple of turns to let the pan go low at that end, then removed all the middle bolts on each side. Then, undo the front corner bolts slowly while holding the pan up, and 80% of the fluid will head out the rear. From there, remove the remaining bolts and the pan is off. You can see it is still dripping oil absolutely everywhere...it dripped all night.... I got another couple of litres when I removed the pan, and then another few when I removed the valve body - all up another 4l on top of the 3 already dropped in step 1.
    • Yeh I think i'll message an old contact i had for ages that manages his own tyre shop now.. n tell him what i want n work with him before ordering..  Got this 17x9 +30 Driftteks on 245/45/17 PSR Drag Radials on the rear.. They fit well - for your reference in future - Rear guards  have been lipped in & minimal to non flaring of the rear Gaurds.    
    • If only it were that easy! I also needed to remove seats, shocks, brake calipers, send my car through a fence, and use measuring and ended up guessing because I didn't remove seats, shocks and brake calipers. It can be hard sometimes Can be a little more complex than 'just measure' if you want to truly measure the entire wheel through all of it's suspension travel. But if you aren't going for every last mm then yeah, you can check the space you currently have and guesstimate.
    • If you own a car, and it has wheels on it, and you know the offset of those wheels, and you have a measuring device, you have everything you need to work out if other wheels will fit.
×
×
  • Create New...