Jump to content
SAU Community

Recommended Posts

Can you put a one way valve on there to avoid exhaust getting into the system?

Yeh I have a hydraulic one way valve im going to use. I just need to modify the spring so its weaker and easily opened as this one has a 0.5 bar cracking pressure. But the rest of it is heavy duty and about the right size.

I finished the breather can last night. It was a mission to put together and weld up.

Also milled the supercharger inlet bracket flat as it had warped from the welding.

There is the one way valve im going to use for the exhaust evac setup.

post-12828-0-48481200-1306269858_thumb.jpg

post-12828-0-61092500-1306269965_thumb.jpg

post-12828-0-28888600-1306269985_thumb.jpg

post-12828-0-23460400-1306270018_thumb.jpg

I got the motor/gbox out on saturday and the block stripped by late afternoon. I cleaned the block up a little and started abit of deburring of edges and cast marks and general loose crap. I picked it back up sunday after shipping the block, head and manifolds to work. More tools, more die grinders and burrs and most importantly more air supply! After about 6 hours of grinding the block ended up looing like this.

post-12828-0-11135600-1306753262_thumb.jpg

post-12828-0-43946300-1306753295_thumb.jpg

You will be suprised at how much casting shit is left in there attached in hard to reach or see places. Main spots I noticed were under the webs where they meet the sump rails and underneath the rails themselves. If you are building your motor, take to it with a die grinder and clean that up. I was quite shocked at just how big some of these flakes were and how loosely they were attached to the block.

Today I picked up a port and polishing kit from down the road. Cost me about 160bux, but it has a heap cartridge rolls, mandrels, extensions, rotary stones and buffs which is pretty well everything you need aside from some carbide burrs. I started after work with some basic port matching of the manifolds to their respective gaskets. While at it I got carried away and cleaned up the runners of the inlet manifold using my new tool set, 40 grit cartridge roll and extension. Took a while but it looks a hell of a lot better then the cast finish and its clean again. I also cleaned up the manifold entry behind the throttle body opening.

It went from looking like this

post-12828-0-70106900-1306753325_thumb.jpg

to something like this

post-12828-0-37753600-1306753389_thumb.jpg

That is pretty well it so far. Tomorrow will no doubt be more of the same! Its fun playing with new stuff.

post-12828-0-24202300-1306753357_thumb.jpg

I love doing stuff like that, but working with old cast iron heads, kills my equipment real quick :(

Really need a good quality Air die grinder.

You changing much with the engine or is it just a quick freshen up?

Yeh, anything ferrous kills equipment unfortunately. Sucks! Great thing about alloys, shit barely wears out at all. Carbide burrs last for almost forever.

Lol, funny you should ask, as Im changing abit actually. Doing the oil control mods properly, block restrictor for head, o ringing block and head if I can fit it in, getting the tunnel honed, bore torque plate honed, crank ground .010" under, some oiling system mods and I think thats it. Probably get piston tops and skirts coated as well.

Also decided to do the rest of the exhaust system in 4" to stop these nightmares im constantly getting of too much back pressure. Probs get that just jap cooling pro 100mm gtr cooler to replace my shitty damaged pwr 75mm gtr cooler.

The more I think about stuff, the worse this all gets!

looking awesome

will you blue print also or thats what gasket matching is

Im not sure I follow what you mean by blue print? The engine during assembly/machining or the head/manifolds?

Gasket matching/ port matching is just some light grinding to make manifold ports and gaskets aligned perfectly (or as close too) and then usually doing the head ports to suit as well. Normally you only match the inlet side so there is no restriction when air is trying to enter the motor. On the exhaust however, you want the gasket and manifold bigger then the exhaust port so any reversion will hit the edge around the port and do a u banger instead of trying to go back down the port and into the chamber. So ive matched my exhaust manifold to gasket and they are both bigger then my head exhaust port which I will leave factory size for that reason.

Hopefully that makes sense.

Yeh, anything ferrous kills equipment unfortunately. Sucks! Great thing about alloys, shit barely wears out at all. Carbide burrs last for almost forever.

Lol, funny you should ask, as Im changing abit actually. Doing the oil control mods properly, block restrictor for head, o ringing block and head if I can fit it in, getting the tunnel honed, bore torque plate honed, crank ground .010" under, some oiling system mods and I think thats it. Probably get piston tops and skirts coated as well.

Also decided to do the rest of the exhaust system in 4" to stop these nightmares im constantly getting of too much back pressure. Probs get that just jap cooling pro 100mm gtr cooler to replace my shitty damaged pwr 75mm gtr cooler.

The more I think about stuff, the worse this all gets!

Sounds good and is also why im leaving the Soarer alone haha.

lol. Farkk, I could have gotten that instead. Ah well. If mine doesnt work I will get that kit instead!

moroso evac fitting kit:

http://www.summitrac...arts/MOR-25900/

I'm putting on into my gts-t as we speak- h aha ha.

Are you putting your 'slash cut' fitting in the center of the pipe? I wasn't going to put it in that far, maybe 10mm in or so. I'm more worried about restriction than maximum velocity for vacumme.

J.

Lol yeh I did, I put it right after a reducer 4" -> 3" 45 cut in the centre. Thats how I was taught to do it as the best setup for maximum vacuum. Hopefully it wont be too much of a restriction.

So I finished my backyard porting job. Pretty well just cleaned up the ports and matched the inlet side. Polished the chambers lightly and roughed up the inlet with 40 grit. Did exhaust in 80 grit.

post-12828-0-08758600-1307189495_thumb.jpg

post-12828-0-22345500-1307189545_thumb.jpg

post-12828-0-11638100-1307189594_thumb.jpg

post-12828-0-27833900-1307189745_thumb.jpg

post-12828-0-40275900-1307189772_thumb.jpg

I have to admit, it took most of the week doing all that. It gets painful around the guides!

Did you read up on porting? Apparently there is an art to doing it properly. I'd be too scared to do it wrong and have worse results.

Yeh I did some reading and looked at what pictures I could find around the place to give me an idea on what to do. I didnt go reshaping ports or anything like that. I just matched the inlet manifold and head to gasket and just cleaned up the casting and machining marks. So all ive done is a clean up essentially. If you go and start opening up port sizes and messing with the shape then you could easily go backwards. But I cant really see any harm in what ive done.

But I will find out when its all going lol.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • It’s new. It’s the cd009. I did take the transmission apart to mill down the bellhousing and had both housings come off the gears so wondering is something isn’t in right. I am running redline. I can get it in gear running too but it’s just not easier and it’s almost like 2, 4, 6, and reverse all the back gears aren’t happy going in
    • I’ll remember that as a last choice. It’s brand new
    • Got keys and did a walk around the yard planning the landscaping works with the family that I will be doing Main effort: remove all the woodchip in the gardens that are around (attached) to the outside of the house and replace with 10mm blue metal, having woodchip close to the house is a recipe for inviting white ants, currently there are no white ants within the block and I would like to keep it that way I'll be buying some large raised garden beds to grow veggies and stuff, and the woodchip will be mulched with everything else that gets dug up, pulled out, or cut down during works Next will some minor drainage and landscaping maintenance up one side of the house, where the fuse box, AC, and solar stuff will go, about 12 mtrs long by 2 meters wide, I'll break up the soil, add gypsum and then I'll dig in a French drains about 300mm deep x 300mm wide and fill it with agg pipe and blue metal, then level out the whole area with a 50mm layer of blue metal, the soil, whilst currently pretty compacted, will break up well with the gypsum to aid in drainage, I'll then cover the area with a 50mm layer of more blue metal In saying this, the drainage issue is minor, but that little hidden away area down the side is untidy and weedy, and as all of the main elec stuff is there I want it neat and tidy to appease my OCD Again, the material excavated from the French drains with be added to the garden bed mulch, as will some rose bushes and some other crap looking garden plants, and a old apricot tree that is looking worse for wear The apricot tree is currently in a little roundish garden bed that is in the middle of the back yard with few other crappy looking plants around it, that will all be removed, levelled, re-turfed, and is a perfect spot for a hills hoist There is also a area about 3m x 2m between the rear fence and shed that will get some attention, it looks like some stuff was stored there and the grass is dead, that will also get broken up and mulched, and is a prime spot for a pumpkin patch I've guestimated that I'll need: 3 tonnes of blue metal, 12 meters of agg pipe, 5kg of Gypsum, and a hills hoist, so a few bags of concrete as well to set it in place (the house currently has one of those pull out 4 line jobs, whilst it works, I want a retro old school hills hoist), I am also going to run some chickens, there's a great spot for a coop, so a chicken coop to suit 4 of those lovely egg laying bitches will also be on the job card That should keep me busy for a while, and will finish off the back yard ready for a early spring planting of some veggies and berries  Once the main effort is done I'll start out the front, there's a large rock garden that could use some TLC, but that is only minor works Should be fully moved in within 2 weeks, the landscaping works will start then Fun times, retirement is good  
    • It happens, that's what your single stage filler is used for.  If it is still visible after the 3 coats of 2k primer, it will be visible after the paint is laid down.  Its hard to give 100% perfect advice without being there in person, I'm very tempted to say stop where you are, fill your pin holes with a single stage putty first then keep going. 
    • New or used transmission? Alignment will be the same with engine running or not. If new, i'm presuming it's a clutch release bearing size issue. If used, are you certain it's a CD009/A and not an older CD008 or less? They had known synchro issues. In my opinion, these transmissions should always be purchased new, they're dirt cheap and you avoid dealing with old revisions. 
×
×
  • Create New...