Jump to content
SAU Community

Recommended Posts

yeh i can do that (i did pm u ages ago but i guess u dont check em!)

i assume ull do your injectors/turbo before say mid-year? (which is when ill likely have the trip meter stuff done around)

yah got your pm in dec saying that a new version would be out jan/feb... tis all good...

doing my turbo pretty soon so might grab an upgrade when youve got a moment and anotherone when the new software is out if thats ok?

  • Replies 279
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

sounding good pm when you get these out

cheers mitch

will do

ed im available generally mon and tues nights. if u let me know before midday on a mon/tues i can have it ready by that night. still have the same mobile number?

  • 3 weeks later...

will do.

i have a few prototype displays available. these are functionally the same as the normal displays, and will be firmware upgradable etc like the others, main difference is they come without the black box/enclosure (which may suit people as the LCD alone is much slimmer to mount somewhere.

$175 + post (express 7, registered 10). If you dont want the integrated consult interface, then you can minus $10 off that. add $6 if paying by paypal. i can also supply display with leads for you to hook up your own buttons (rather than using the ones on board). cable lengths can be whatever you want.

see http://www.ecutalk.com latest news post for more info, and a couple more pics

custom7s.jpg

Peter,

is it true that this consult/LCD and your previous consult box dont work with a powerfc? They only work on the stock nissan ECU?

Any ideas on what you can use to get data from a powerfc -> carputer (via serial), which wont cost an arm + a leg?

thats right, consult is a nissan thing, if apexi implemented it then they might have visits from nissan lawyers :D

look into fc datalogit (or something to that effect). i think paulr33? has compiled some form of powerfc faq somewhere which might have info on it, not sure.

  • 1 month later...

i can actually make 1-2 prototype ones, with the normal black enclosure, except it will just need a bit of black tape on ends to ensure it doesnt pop open (shouldnt anyway, but just to be sure).

gap1.jpg

you can see how theres a bit of a gap where the bits join. it would be $190+post for that

the next batch, im considering changing straight away to a 20x4 setup (rather than doing another lot of 40x2 characters setup same as this one) which isnt as long, has buttons on front, and would fit in a DIN slot (<50mm high) if required. eg 125x45mm (rather than 188x39mm like current one). price of next lot would be determined by how much the plastic enclosures cost, maybe around $220 mark? theyll be as cheap as i can make them, cause everyone should have one!

the next batch will be, at this stage, around september mark.

Love your work man. Put me down as a definite for your September run. A 20x4 screen sounds good too.

I reckon this thing is a good reason to go piggyback - i'm gonna love having one to go with my e-manage ultimate.

Actually..... PM sent.

Edited by govich
  • 3 months later...

september, october, november maybe...these things always take longer than you want them too :cheers:

just about to start redesign of PCB for version 2. enclosure design is part way there too.

  • 1 month later...

the main part needed to run the display wont be available till ~12 dec (at current estimates by supplier). so i guess thats a rough aim for me to have all the hardware done and ready by.

then its just a matter of how many features can be put in before a limited (or full) release.

if i can get the firmware updating working fine (ie you can update firmware on unit yourself like you would with a adsl modem or computer bios) then ill be able to get them out sooner than later.

ive already bought 30 lcd modules, and probably have half the parts needed for the boards already. need to finish off design of PCB and get some prototypes made, hopefully by start of next month. then need enclosures done...once enclosures are ready, final pcb to be manufactured/assembled (hopefully wont need to do most of assembly myself), and then a lot of work on the firmware (the stuff that runs the display)

  • 4 weeks later...
Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • Haha, i kow right? Could have bought so many cars for the same amount of money (or less) but driving Unicorn gives you at least +1mln to style 😅. Like wise man said "life's to short to drink cheap wine and drive boring cars" 😉
    • Newbie here, proud owner of an Autech 260RS. I'm on the hunt for wiring diagrams specific to the 260RS, particularly S1. I've ran my eyes through R33, R34 Diagrams, there are some similarities, however continue to find incorrect wire colours and pins on connectors in the 33,34 diagrams.   I was hoping someone could point me in the right direction? I'd be happy to pay for the originals in Japanese. I can translate them, at least they would be accurate.   Any help please would be greatly appreciated, never heard an RB26DETT before let alone driven one, and I've got a spaghetti monster of goodness to sort out.   Cheers Benny  
    • Hey all  im wondering if you can help me please I have put a rb20 box in my r34 gtt as my auto packed up and a friend had a spare box I know it’s not ideal but it will get me up and running for now. we have done the conversation and everything is working great but my Speedo we got a s13 speed sensor but my Speedo reads double now and I bought a speed converter but still not having any luck.  so I thought I’ll reach out and pick your brains  any help would be appreciated please as I wanna drive my car again 
    • Drain it. I got official Matic D but you can get whatever is listed as Matic D compatible.
    • Thanks guys,  Yeah I should at least have them dynoed, at least then I know what I've got as a starting point.  The springs on these are hard as rocks. I vaguely remember Russman saying he was going to sell the shocks to me with the rocks fitted, as he was keeping the softer springs for his new setup.  I didn't click at the time but of course that was to let me know the shock/spring wouldn't be matched.  I also remember pricing up new springs around 2014-15, but, house, money etc. it never happened. So that was another reason to have them rebuilt. I have rebuilt the forks on many motorcycles so I think I could handle the seals on these easily enough, but getting the valving right would be a rabbit hole I cbf exploring.  Duncan, interesting to hear RP was tuning these back then. I might give them a call.  In the mean time I have been busy fitting sway bars. The Whiteline rear sway bar I purchased 15 years ago finally got fitted, along with the Whiteline front bar that showed up last week. Just waiting on new links for the front sway bar to finish that off.  And my spare set of advan AVS VS5's should be back from the powder coaters in a Pearl White finish sometime this week, with a set of Hankook RS4's lined up for fitting.  And then I just have all the suspension bushes to do. A comprehensive kit is on the way... Lots to do before the Ararat hill climb. Cheers guys 🍻   
×
×
  • Create New...