Jump to content
SAU Community

Recommended Posts

yeah it's only the "IT fanbois", until mum and dad can't use their T-Box because one of the kids is watching 1080p YouTube streams, or can't use Skype because someone's downloading the latest episode of Game of Thrones, someone can't watch their uni lecture online because someone is playing games online etc etc.

The reason that those of us in the industry rant on about it, is because we know how much bandwidth the "average" user uses, and with the exception of the baby boomer generation and older (and even then that's starting to get lower with the prevalence of ipads etc), it's growing at an exponential rate.

You must associate with a small clique of Luddites, the internet and associated services are ubiquitous and widely used by MOST people. To me it's like saying that the Hume Highway should have been kept single lane and asphalt.

There are VERY FEW people who actually get above 20mb/s on DSL, and outside the cities and major centres, it's even worse. I could give you the TL;DR explanation as to why, but simply put the technology is at the end of the road, and cannot cope with the amount of growth on it.

  • Replies 54
  • Created
  • Last Reply

Top Posters In This Topic

There is a vast gulf between saying most people use the internet (which they do, clearly) and saying that most people need NBN sized download speeds so that the latest pirated episode of Star Trek can be downloaded in less than 2 minutes. (which they dont)

If you want to make the argument about infrastructure then $20 billion buys an awful lot of Hume Highways or hospitals or schools or universities. Maybe even enough that there will be road leading to your local uni so you can actually attend it in person. Instead of a mass of IT infrastructure that may (MAY) be fully utilised some decades into the future.

You're still not getting it are you.

LEGITIMATE uses of large amounts of bandwidth and the underlying technology (that will last without upgrade WELL into the forseeable future) not to mention scalability is what I'm getting at, not discussing semantics about whether people really *need* high speeds to illegally download etc.

The amount being invested now is a drop in the ocean compared to the return on investment and future possibilties available.

I do happen to work in tertiary education - the focus at work is more and more and more on video conferencing, VOIP, hosted services, online delivery and course content as well as document management etc. This is not "decades into the future", this is happening now, and I've seen bandwidth requirements quintuple here in 3 years alone.

I understand your point. I just dont agree with it. $40 billion is not a drop in the ocean. It is a shtload of money much of which will be wasted on excess capacity and connections that people wont ever use. Money that could be used far better elsewhere.

That's where you're wrong, the money CANNOT be used elsewhere. It's being loaned to the government under particular circumstances because it's being used for the NBN.

It's like going to the bank and asking them for a loan for a house and then using the money they give you for a round the world holiday.

$40B over 10 years IS a drop in the ocean in relative terms, ie. when you have a GDP of nearly $1,500B per year and a budget of around $400B per year.

The ALP NBN is incredibly affordable and by far and away the best option. The current infrastructure underpinning Australian communications is f**ked. It needs to be replaced, so do it once, do it right and do it with fiber.

And now we know the Liaberals are going to spend $25B giving us FTTN, we should really be comparing the savings from FTTN to FTTH. The difference is $15B cause at least $25B will be spent, regardless of who rolls it out. $15B to upgrade from FTTN to FTTH is an absolute no brainer.

Do it once, do it right.

Great website. It clearly demonstrates the real world advantages of Labour's NBN in real world situations. To see these benefits that will affect us now and then consider how much filesizes may grow in the coming decades leaves no doubt in my mind that it is worth paying a bit of extra money up front for the NBN.

As someone who works in the telecommunications industry I completely agree with bozodos as well as a few of the other guys here

Within the last 8 years the need for faster speeds and greater download capacity as grown.

I've seen plans go from 400MB to 1TB on the HFC network and Unlimited on the ADSL network. Speed wise, companies like telstra and optus are now offering docsis 3 (up to 100mbit/s) but these speeds are not available to everyone. Telstra only offer this to Victoria (as far as I'm aware) and Optus to the QLD, NSW and VIC (but even this is limited to older suburbs)

Even though the current pricing/download quota that is being advertised is expensive (they will eventually go down, they always do) , I believe the NBN is the way to go in the long run

The pipes to overseas is not the only thing that needs to be upgraded. These can be upgraded to handle anything Australia has to throw at it, the telco's still need to upgrade their international capacity.

If this does not happen, the upgrade to the pipes are useless. Then it also depends on how the telco's route their traffic.

I have adsl2 and live 4-4.5kms from an exchange, line sync at best is 4meg, I say bring on the NBN

There's a lot more I could add but my brain's currently fried after a 12 hour shift :wacko:

Currently have NBN, best thing ever. I get speeds of 10-11 Megabytes per second (around 80-88 Megabits) for a 100 Mbps plan. Definitely something that I was looking forward to. Nothing better than streaming 1080p from comp to the TV through wireless :D

Currently have NBN, best thing ever. I get speeds of 10-11 Megabytes per second (around 80-88 Megabits) for a 100 Mbps plan. Definitely something that I was looking forward to. Nothing better than streaming 1080p from comp to the TV through wireless :D

If you don't mind me asking, how much are you paying per month and what's your data limit?

Paying $130 a month for 500gb through Telstra and on top of that included free handset, T-box, modem/router and free installation of any hard wiring done from my garage (NBN box) to the computer and T-box setup through Foxtel.

Overall, it's probably more expensive than other companies but firstly I'm with Telstra for everything i.e. mob, home ph, foxtel, internet. Plus some other companies couldn't offer 100 Mbps plans, 500gb limits and had restrictions with on and off peaks too.

wow there is a lot of miss information in this thread, specially when its comes to the DSL network. Copper is the underlying issue with the DSL network through and through! This has nothing to do with the backbone of TLS or OPT or matter of any other carrier that supplies that..

Given the complaints of users vs bandwidth on DSL no carrier has a garunteed CBR to any consumer user so depending on the bandwidth (from DLSAM to agregator then into the cloud etc) of each exchange or POI so this point is then irrelevant. Keep in mind that also home networking will become an issue with multi person streaming but thats a whole nother kettle of fish

TLS whole network is fibre through out including to their mobile base stations

OPT has fibre backbone to its 13 super exchanges and has a lot of leased lines

i can go on all day here however given this is about the NBN which is a great idea for AUS given we are 10+ years behind the rest of the world carrier wise this will be good to bring us into the future of bandwidth and tele confrencing etc etc etc

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • Had a go at the stuck crush tube this afternoon. Tried things like grips and a chain wrench first but wouldn't just twist straight off. So got to work with a drill. Started small and kept a depth stop on to make sure I didn't drill into the bolt. Made a line of drill holes all the way up and enlarged them. Then a combination of chisel and Dremel to split it all the way up. Levered the split to get oil in there and eventually it gave a bit while levering. Worked it back and forth with loads more oil till it was spinning freely, then with grips I could work it downwards and off. And no significant damage to the bolt (not by me anyway - just the 27 years of rust)
    • Well, I'm tired. I'm tired because about 4PM yesterday, before today's appointment someone immediately bought my bumper. They couldn't get it any other day as they're on the way back to NSW. So I had to do that big GTR conversion I had been planning. Unfortunately, the information on SAU about what you need and how this is done is incomplete. So what should be a simple bolt on affair, yeah, it's not. Did you know if you use all GTR items the bonnet won't close? This little manuever sent me into about 1am the night before trying to dodge a way to get it closed. I will have to revisit this in the next few days  - or maybe not, I may let a body shop figure it out. It all needs to come up and my motivation to pull the bumper off is low. It also seems to hit things in the bay where the GTT bonnet didn't. Yes I used 100% new OEM GTR items. Today, I had the joy of driving to the dyno looking like this: Given I had roughed in the fuel and given sensible but pretty conservative timing, I didn't really bet on having the car drive out any real difference than when it drove in. Sadly due to a miscommunication and laptop fun and games (and almost bricking the dongle, prayers and firmware updates indeed), I ended up using HP Tuner credits to licence the car that was already licenced. So in the end my laptop was used. It turns out my butt dyno is still well calibrated after all this time. The 325kw was on 74% Ethanol, the 313kw line was on 98. The other line is the 'before' line which was 281kw. While the numbers are pretty low, they're pretty in line with what you'd expect. Even if US dynos bump the whole result up about 50KW, gaining 10-15% is similar gains.  The curve of the cam is pretty much spot on with what was discussed as well. All this said, it still feels bad to not see the number you secretly want to see. Even if the car drove great beforehand, and I knew pretty confidently the car would drive out much the same way it drove in due to the nature of a wellish dialled in LS1 not gaining much if anything at all from being tuned from where it was. As expected, the car isn't particularly sensitive to running it at anywhere between 12.0 and 13.0 - And the initial timing at 20deg and 12.0 made 308KW. So 3 degrees of timing, and leaning it out to 12.7 for 5kw, anything above stopped giving any benefit until E85 (which has an additional 2 deg as before). Car itself behaved entirely fine. I found out that 100C = 1.15V! IAT at about 7pm was 19C. I might mess with the bonnet mounting.. but given the REO NEEDS TO BE CHOPPED TO FIT A GTR BAR this is possibly something I may leave gathering (more) dust until it returns to paint jail.
    • It sounds farrrrrrr too cold at your place Duncan... Here I was thinking our 10 degrees overnight is getting cold...
    • oh yeah, reminded this morning....bin lids frozen shut too
    • In my case not, because of total reno. But yeah.
×
×
  • Create New...