Jump to content
SAU Community

Recommended Posts

I dont think my battery even weighs like a kilo it's tiny, may as well be one of those little 9v batteries

You'd be surprised.

Thought my R1 battery was small but it was 4.5kg - saved nearly 4kg by using lithium. That's a lot of unsprung weight on a bike. People pay thousands for that kind of weight saving.

Phillip Island in a few weeks should be goooood I wonder what speed I'll get down the straight..

lol keep ya head down

Phillip island straight on a naked = gonna have a bad time

Why does it have anything to with the government? NBN has been a clusterf**k for a few years now. Visionstream were a primary contractor and had sack a lot of staff to reduce overheads from NBN playing hardball. Like many government backed initiatives, the cheapest bidder is selected, the price blows out due to poor estimations and general incompetence.

Whoever is in government at the time has little affect on this process.

The article I mean. Essentially blaming the government for changing the scope of the NBN and then blaming them when the project was within budget during Labour reign and now blowing out during liberal reign.

I think it works both ways

It's not beyond governments to put in measures of control for budgeting, but there are also variables you can't account for. And if delegations and contractors were lined up during a previous reign of government that's a bit difficult to control.

Forecasting an enormous project with so many variables is also very hard. I don't mind it blowing out within good reason, but when it's clear that private contractors are rorting or being rorted, that's when I feel not enough measures have been put in place or enough control exercised by governments. The insulation scheme, for example, should have been much better regulated than cheques written and contractors left to their own devices.

so want to stab some-one for that...all this money to guarentee slower internet than most of us get now.

Why does it have anything to with the government? NBN has been a clusterf**k for a few years now. Visionstream were a primary contractor and had sack a lot of staff to reduce overheads from NBN playing hardball. Like many government backed initiatives, the cheapest bidder is selected, the price blows out due to poor estimations and general incompetence.

Whoever is in government at the time has little affect on this process.

how does it have anything to do with the gov..idiots decided to drop grom 100mbit to 25..

So spending a shit tonne of cash for the internet most of us already had/or faster.

they should have kept the original expandable system Labour had or cancelled it..which would be a better option as they cannot innovate like private business trying to clear a profit would.

^this

It's a LOT of money to drop on effectively obsolete technology.

Even if the labor model was more expensive it was the better option. This LNP clusterf**k will cost another $50 bil in a few short years when the whole thing needs to be replaced

What are you all crying about? The article clearly states that any additional funds will be raised from private investors & not government.

So relax, your precious tax income isnt being spent.

Also if you read the article instead of shouting that the sky is falling, it says:

"While 20 per cent of premises will get fibre connections, 38 per cent will get fibre to the node and 34 per cent will access the NBN using the hybrid fibre coaxial cables that supply Foxtel services."

HFC connections offer gigabit speeds & not the doomsday 25mbps.

f**k me, everyone has turned into a telecommunications engineer/capital coordinator.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • Yep, the closest base tune available was for the GTT, I went with that and made all the logical changes I could find to convert it to Naturally Aspirated. It will rev fine in Neutral to redline but it will be cutting nearly 50% fuel the whole way.  If I let it tune the fuel map to start with that much less fuel it wont run right and has a hard time applying corrections.  These 50% cuts are with a fuel map already about half of what the GTT tune had.  I was having a whole lot of bogging when applying any throttle but seem to have fixed that for no load situations with very aggressive transient throttle settings. I made the corrections to my injectors with data I found for them online, FBCJC100 flowing 306cc.  I'll have to look to see if I can find the Cam section. I have the Bosch 4.9 from Haltech. My manifold pressure when watching it live is always in -5.9 psi/inHg
    • Hi My Tokico BM50 Brake master cylinder has a leak from the hole between the two outlets (M10x1) for brake pipes, I have attached a photo. Can anyone tell me what that hole is and what has failed to allow brake fluid to escape from it, I have looked on line and asked questions on UK forums but can not find the answer, if anyone can enlighten me I would be most grateful.
    • It will be a software setting. I don't believe many on here ever used AEM. And they're now a discontinued product,that's really hard to find any easy answers on. If it were Link or Haltech, someone would be able to just send you a ECU file though.
    • Yes sir am asking is there possible way from aem tuner from wiring pins 
    • Have you checked cam to crank timing and confirmed balancer marks are correct?
×
×
  • Create New...