Jump to content
SAU Community

Recommended Posts

I've decided housing affordability = directly proportional to Alex's financial position

Well it goes a little against the grain of what your saying though doesn't it.. Cos if houses were more affordable.. Then more people would buy them so I'd make even more money.

Hrmm...

last realestate q for the day.

lets say I'm looking at a 250K block and a 350K house.

buying block off the plan so won;t be ready for a bit so will prob be at least 12 months between buy block and start house.

lets say i have 100K for deposit

How does that work with a loan.

Do I take out loan with full deposit for the block, then when ready for house refinance for the full amount.

or is the initial loan for the full amount and just withdraw and needed?

or take out loan with part the deposit for the house then use the rest when financed the house itself?

exactly right.

a farmer is sub diving a Padock into 6 lots

5 - 6 acres each.

but that said he needs to run power/water to each (that part of the advertisement) plus fencing and such.

it's interesting there 6 blocks 5 currently at 350K 1 at 280

so they obviously trying to work out what price they should be at, from other blocks seen for sale I think 5 are 220ish and the one I want 250-260K

Just offer what you feel it's worth in writing if he knocks it back no harm done

last realestate q for the day.

lets say I'm looking at a 250K block and a 350K house.

buying block off the plan so won;t be ready for a bit so will prob be at least 12 months between buy block and start house.

lets say i have 100K for deposit

How does that work with a loan.

Do I take out loan with full deposit for the block, then when ready for house refinance for the full amount.

or is the initial loan for the full amount and just withdraw and needed?

or take out loan with part the deposit for the house then use the rest when financed the house itself?

If it's 12 month settlement (title) you can't take out a loan as finance pre approvals are only valid for like 3 months so you pay deposit and work out the rest closer to settlement

But down the track you'd ideally borrow no more than 80% to avoid LMI

last realestate q for the day.

lets say I'm looking at a 250K block and a 350K house.

buying block off the plan so won;t be ready for a bit so will prob be at least 12 months between buy block and start house.

lets say i have 100K for deposit

How does that work with a loan.

Do I take out loan with full deposit for the block, then when ready for house refinance for the full amount.

or is the initial loan for the full amount and just withdraw and needed?

or take out loan with part the deposit for the house then use the rest when financed the house itself?

Are you going to be using a major registered builder like henley homes etc or is it a mates build type thing?

There are huge differences in how BICOE funding works depending on who's building it.

The long and the short of it, try to keep as much of your deposit free for the construction loan, not the land loan.

12 months apart they will be 2 separate deals.

So maybe use $30k max to pay deposit and legals for the block and keep as much of the remaining $70k as possible for the build.

Id try for 5% deposit on the land but if it's a developer likely they'll demand 10%

I read that as he needs to buy the land in entirity first, in which case he will need a bigger deposit for the LVR

Ham is correct.

the sub divide is passed with the council and shit but the work not done.

else would be easier.

I expect will take 12 months at least for the block to be ready to build

for ease of work this is the block looking at:

http://www.realestate.com.au/property-residential+land-vic-nagambie-201233937

and the builder something like:

http://diversebuilders.com.au/HomeDesigns/DesignDetails.aspx?dpk=20

(looking at a few builders but all similar)

and if you guys are confused think where I'm at!

That should all be doable as 1 deal so long as you pay the deposit out of your own pocket.

They are a registered builder so that deposit should be sufficient.

Ham is correct.

the sub divide is passed with the council and shit but the work not done.

else would be easier.

I expect will take 12 months at least for the block to be ready to build

for ease of work this is the block looking at:

http://www.realestate.com.au/property-residential+land-vic-nagambie-201233937

and the builder something like:

http://diversebuilders.com.au/HomeDesigns/DesignDetails.aspx?dpk=20

(looking at a few builders but all similar)

and if you guys are confused think where I'm at!

A rumpus, living room & family room. I wouldn't know what to do with all that space!

Makes my shoebox of a townhouse look even smaller in comparison to that haha

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • You’ll be very upset when you bust that too not to mention the gearing totally sucks. Don’t do it.
    • Is the panel filter one that is oiled? Have you ever cleaned or touched the AFM?
    • So.... the K&N air box thingo was too big, ended up gifting it to a mate, well, by gifting it he actually supplied food and beer at the pub,  which was nice, as it will not sit on a shelf in the garage for the next 10 years I did trim up some of the existing stuff to neaten it all up and gave it some wrinkle paint, unfortunately it currently has a used and abused mish mash of different types of hose clamps, 4 big fat T bolt type (shit), and a few normal clamps of vairing sizes and brands, but..... only until the 6 constant tension black worm clamps that I ordered from EFI solutions turn up next week Currently the current hose clamps are triggering me hard, LOL Is this the final version, probably not, I really want just 2 silicone pieces, a straight bit of silicone from the filter to the MAF is easy and will happen as soon as I head into Just Jap tomorrow, the problematic part is a 30° silicone bend from the MAF to the TB that I can connect the engine breather from the head, I found that there are bulk head fittings for boat bilge pumps that should work, but until I can get a 30° silicone bend the alloy pipe, and the 11ty thousand hose clamps, are there for the foreseeable future 4 hose clamps are golden, 6 are grudgingly acceptable, the 8 currently holding it all together is just taking the piss    I've also ordered 60 more retaining wall blocks for the front yard, I mis-gonculated the height that was required to get above the base of the Photinia's (red robin's) that are the hedge behind the front fence, currently it is 2 blocks high, and about 1/2 a block short, so going 3 blocks high will be above the base of the red robin's, and allow some room for mulch
    • It is the stock air box with the panel filter. Everything else is stock except the exhaust at this point, as I also went back to the cleaned 270cc injectors. I will check the RPM when the IACV is unplugged and report back.
    • As MBS suggested if this is happening when the engine is cold you're going to want to remove the intake air regulator and verify resistance + that the shutter is physically opening and closing. At -20C should be fully open, 20C half open, over 60C fully closed. At 20C should be 70-80 ohms. For AAC valve testing using a Consult cable see if you can raise and lower the idle by commanding more or less AAC duty cycle. Hopefully it's pretty linear as well, shouldn't be like 30% AAC valve is barely idling and 40% is 1500 rpm.
×
×
  • Create New...