Jump to content
SAU Community

Recommended Posts

Digging starts in 18 months.

Do you live in the SW? Do you travel to the SW? Are you stymied by the M5?

Another impost toll? Any costings to the consumer yet?

Any use to you - or will you have moved away by the time it's finished?

Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/
Share on other sites

Yay something that should have been done 15 years ago. Will probably cost $20 one way, but whatever, at least they're getting somewhere. The current M5 widening is taking very long, do they have a crew of 5 doing all the work? This will take 20 years to complete and cost 9,001 billion dollars.

I would be happy to use it though, although the road will probably turn into a testing ground in 6 months time (like most Sydney roads end up).

Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/#findComment-7026264
Share on other sites

Don't live in the SW, don't travel there often - but what i can comment on is that this money is better spent on public transport infrastructure rather then creating more road for cars to clog up. Absolutely effing stupid. And what's worse is most likely, roads surrounding the westconnex will be suddenly 'reconfigured' so to force people to use it...just like the LCT. I absolutely hate driving down Lane Cove road from the epping section out past Lane Cove, but in order to get to the city or even North Sydney, that's the only direct way without detouring via chatswood OR going via five dock. It's absolute madness.

In that vein, I would say I hope to be out of here by the time it's done. Or sooner.

Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/#findComment-7026375
Share on other sites

O'Farrell Lib Gov't is now about to bid on the "Cross City Tunnel" in order to free up congestion in the CBD > Toll will be lowered (if purchased).

Makes Sense > especially after my old high school buddy (actually from my same year) Paul Forward, head of RTA at the time, signed off on its construction at a cost of more than double what it was worth.

He bragged at a Canterbury HS Reunion how it was his 'baby'; and how it was going to revolutionise city traffic. He disappeared out of the limelight after being thoroughly embarrassed.

Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/#findComment-7027726
Share on other sites

It was way too expensive for such a short trip.

Sick of all these private tolls, if they can't manage tax dollars then they shouldn't be built. M2 prime example - sick of contributing to the Mac Bank Christmas party fund - just for the privilege of being able to use my car, which itself is taxed heavily too. They did all that construction work that reduced the speed down to snails pace for ages and then added all those additional on ramps.

Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/#findComment-7027768
Share on other sites

It was way too expensive for such a short trip.

Sick of all these private tolls, if they can't manage tax dollars then they shouldn't be built. M2 prime example - sick of contributing to the Mac Bank Christmas party fund - just for the privilege of being able to use my car, which itself is taxed heavily too. They did all that construction work that reduced the speed down to snails pace for ages and then added all those additional on ramps.

it has improved the road big time tho and I heard the blokes who did the asphalt are awesome :D lol
Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/#findComment-7028018
Share on other sites

So they are going to spend billions of dollars to get people from one bottle neck to another? The stretch of Paramatta Road from the City West Link to the M4 makes me want to stab people sometimes, I would have though starting out there and working east would make a bit more sense?

  • Like 1
Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/#findComment-7034960
Share on other sites

So they are going to spend billions of dollars to get people from one bottle neck to another? The stretch of Paramatta Road from the City West Link to the M4 makes me want to stab people sometimes, I would have though starting out there and working east would make a bit more sense?

governments normally go with the route that makes the least sense.
  • Like 1
Link to comment
https://www.sau.com.au/forums/topic/432041-west-connex/#findComment-7035016
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • Yeah, it's getting like that, my daughter is coming over on Thursday to help me remove the bonnet so I can install the Carbuilders underbonnet stuff,  I might get her to give me a hand and remove the hardtop, maybe, because on really hot days the detachable hardtop helps the aircon keep the interior cool, the heat just punches straight through to rag top I also don't have enough hair for the "wind in the hair" experience, so there is that....LOL
    • Could be falling edge/rising edge is set wrong. Are you getting sync errors?
    • On BMWs what I do because I'm more confident that I can't instantly crush the pinch welds and do thousands of USD in chassis damage is use a set of rubber jacking pads designed to protect the chassis/plastic adapter and raise a corner of the car, place the aforementioned 2x12 inch wooden planks under a tire, drop the car, then this normally gives me enough clearance to get to the front central jack point. If you don't need it to be a ramp it only needs to be 1-1.5 feet long. On my R33 I do not trust the pinch welds to tolerate any of this so I drive up on the ramps. Before then when I had to get a new floor jack that no longer cleared the front lip I removed it to get enough clearance to put the jack under it. Once you're on the ramps once you simply never let the car down to the ground. It lives on the ramps or on jack stands.
    • Nah. You need 2x taps for anything that you cannot pass the tap all the way through. And even then, there's a point in response to the above which I will come back to. The 2x taps are 1x tapered for starting, and 1x plug tap for working to the bottom of blind holes. That block's port is effectively a blind hole from the perspective of the tap. The tapered tap/tapered thread response. You don't ever leave a female hole tapered. They are supposed to be parallel, hence the wide section of a tapered tap being parallel, the existince of plug taps, etc. The male is tapered so that it will eventually get too fat for the female thread, and yes, there is some risk if the tapped length of the female hole doesn't offer enough threads, that it will not lock up very nicely. But you can always buzz off the extra length on the male thread, and the tape is very good at adding bulk to the joint.
    • Nice....looking forward to that update
×
×
  • Create New...