The engineering department would build/design to whatever budget is given to them however it's their responsibility to flag any risks. It's up to the project manager/directors to accept this risk.

Exactly.

And either they did... And then it is ING's management fault.

OR they did not - And they are squarely to blame. If the engineers had a report highlighting the risks etc, it would most likely have been leaked by now. Especially as Work Safe was involved with it all etc etc.

The fact it wasn't leaked or hasn't even been mentioned strongly indicates it was just shitty engineering from the outset... Which is little surprise as that is how things are "done" in recent times because people have NFI what they are doing.

Sorry Pat,

Would have to disagree with you here.

I find it highly unlikely that the engineers built the ferris wheel knowing the risks and that it was due solely to budget. If they knew theithere was a risk in it failing upon being built, I would say that they would have abandoned the project or asked for additional funding.

Moreso that they just stuffed up.

Also their are alot more factors to determine if a project is viable other than payback period. I.e NPV,IRR,and other economic factors such as cash flows, good will and additional interested attracted to the area.

+1

ING would NEVER let a wheel get built that "Will crack in a Melbourne summer" and "It will cost you 4x as much as a result".

It's just retarded. Poor design is certainly the winner here. It's almost sounding like a Gov't project that gets fed to someones "mate" and then costs "blow out unexpectedly"

Sorry Pat,

Would have to disagree with you here.

I find it highly unlikely that the engineers built the ferris wheel knowing the risks and that it was due solely to budget. If they knew theithere was a risk in it failing upon being built, I would say that they would have abandoned the project or asked for additional funding.

Moreso that they just stuffed up.

Also their are alot more factors to determine if a project is viable other than payback period. I.e NPV,IRR,and other economic factors such as cash flows, good will and additional interested attracted to the area.

Yes no doubt there was a stuff up but I wouldnt say its 100% engineers fault. They are contracted/paid to come up with a design that meets the budget of the project. Engineering Dept can show several designs at different costs and risks associated but at the end whoever approved and accepted the risk is at fault.

We dont know.. perhaps at the start of the project they believed the budget was enough to cover. Once you start doing the final design/costing, thats where it adds up and could have blown over budget. With investors promised a return & capital locked, cost would have been cut to squeeze within budget. Most likely the order was given to cut costs, changes were rushed, materials swapped, support beams deleted etc to deliver something which falls close to budget.

If the project manager was guaranteed that it wouldnt fail then I would agree that the Engineering/design team was negligent. If there was a risk, thats where management decide to ask for money or accept the risk...

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

Also well aware of IRR, NPV etc when it comes down to capital investment & approval.

Discussion was not tailored towards Chartered Accountants :cheers:

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

So how is it then, that our one has turned into a pile of sh*t?

Poorly designed, poorly constructed.

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

All the money in the world cannot stop shit house design work.

So how is it then, that our one has turned into a pile of sh*t?

Poorly designed, poorly constructed.

Someone had an idea that a ferris wheel can be built for that amount of money.

Either make it happen, or we'll find someone else who will.

Perhaps the engineering firm lied about their design or management accepted the risks.

Time will tell...im saying dont be blaming engineering just yet

All the money in the world cannot stop shit house design work.

Structural engineering; If you want something stronger, then keep adding steel and concrete :nyaanyaa:

This equals more money, so I disagree with your statement...

Australia can design a lot of good things, we just dont have the economy to build here. Hence why companies outsource design work to Australia..

and My ki,

Some manager made the call that we can make a system cheaper than just buying one made.

However after the final details came through, thats where the same manager realised he greatly underquoted.

Nothing to do with Engineering in my opinion. Purely money saving driven, instead of opting for a longer payback period with an existing overseas system.

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • I wasn’t able to replicate the sound anymore. It was a one time sound so maybe it was just coincidence but it was like small pebbles being dropped in a coke can.   should I try cleaning the MAF? It could be it’s functioning but dirty? I don’t know.
    • Update 4: Hi all. The car drives again! Haven't driven for long, only to store it in the garage again, but the test drive was successful. The coolant and oil leaks seem to be fixed for now. Temps on the engine were also very good, while moving I never even saw 80C water during the approx. 30 minute drive. Ate up all the coolant in the reservoir though so will have to fill that even more when I go to the car next time. One thing that pisses me off is that the RPM gauge is still f**ked, I even resoldered the board twice and used copper paste on the silly screws that are used as connections. Next time I take it out I'll take apart the board and fit new components, I'll see if I can get a replacement IC for it.  I have an appointment set for 22nd of September for the engine tune to 370hp. Alignment also still needs to be done. My hope is that I can get all the legal stuff over with by the end of this season. Anyone of you have advice regarding intercoolers? Currently there is an APEXI core fitted, one of those weird hybrid ones, 600x270x76. I don't think it's bad but it's not new and now I still have the chance to change it now to legally include it in the paperwork. Only issue is that the only options that would arrive in time are a HKS Type R intercooler or generic Ebay spec intercoolers comparable to a JustJap one. Ideally I'd order a Plazmaman but it takes over a month to receive which would mean making the car legal has to wait until next season. Would love to hear some input on this. Same story for my injectors, the previous owner was a nunce and put ID 1050x on the engine. They work but are obviously not ideal at "normal" power levels. But I don't see a reason to change them unless the tuner says it's necessary. I read online before buying a different exhaust that the top secret style rear diffusers won't fit due to the size of the rear resonators. My buddy and I made it work by slightly "adjusting the shape" of the mounting bracket and making some spacers out of 3d print for the mounting bolts. Fits like a charm. Just putting this here in case someone has this problem. Even the hefty HKS Silent Hi Power rear can fits without hitting anything.
    • Well they got my money but they are not getting my gearbox ! 
    • It's needed for rolling idle up, and I think it is a decider on VCT also.
    • I mean, not really. Link ECU's can absolutely still have errors from the ECU thinking it's getting a sensor it's not expecting. I would imagine the speed at the ECU level in Nistune does absolutely nothing anyway? I assume the ECU does not do any fancy TC stuff with regards to front+rear wheel speed or anything of that like anyway. Someone who uses Nistune may be more fluent in it. 
×
×