The engineering department would build/design to whatever budget is given to them however it's their responsibility to flag any risks. It's up to the project manager/directors to accept this risk.

Exactly.

And either they did... And then it is ING's management fault.

OR they did not - And they are squarely to blame. If the engineers had a report highlighting the risks etc, it would most likely have been leaked by now. Especially as Work Safe was involved with it all etc etc.

The fact it wasn't leaked or hasn't even been mentioned strongly indicates it was just shitty engineering from the outset... Which is little surprise as that is how things are "done" in recent times because people have NFI what they are doing.

Sorry Pat,

Would have to disagree with you here.

I find it highly unlikely that the engineers built the ferris wheel knowing the risks and that it was due solely to budget. If they knew theithere was a risk in it failing upon being built, I would say that they would have abandoned the project or asked for additional funding.

Moreso that they just stuffed up.

Also their are alot more factors to determine if a project is viable other than payback period. I.e NPV,IRR,and other economic factors such as cash flows, good will and additional interested attracted to the area.

+1

ING would NEVER let a wheel get built that "Will crack in a Melbourne summer" and "It will cost you 4x as much as a result".

It's just retarded. Poor design is certainly the winner here. It's almost sounding like a Gov't project that gets fed to someones "mate" and then costs "blow out unexpectedly"

Sorry Pat,

Would have to disagree with you here.

I find it highly unlikely that the engineers built the ferris wheel knowing the risks and that it was due solely to budget. If they knew theithere was a risk in it failing upon being built, I would say that they would have abandoned the project or asked for additional funding.

Moreso that they just stuffed up.

Also their are alot more factors to determine if a project is viable other than payback period. I.e NPV,IRR,and other economic factors such as cash flows, good will and additional interested attracted to the area.

Yes no doubt there was a stuff up but I wouldnt say its 100% engineers fault. They are contracted/paid to come up with a design that meets the budget of the project. Engineering Dept can show several designs at different costs and risks associated but at the end whoever approved and accepted the risk is at fault.

We dont know.. perhaps at the start of the project they believed the budget was enough to cover. Once you start doing the final design/costing, thats where it adds up and could have blown over budget. With investors promised a return & capital locked, cost would have been cut to squeeze within budget. Most likely the order was given to cut costs, changes were rushed, materials swapped, support beams deleted etc to deliver something which falls close to budget.

If the project manager was guaranteed that it wouldnt fail then I would agree that the Engineering/design team was negligent. If there was a risk, thats where management decide to ask for money or accept the risk...

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

Also well aware of IRR, NPV etc when it comes down to capital investment & approval.

Discussion was not tailored towards Chartered Accountants :cheers:

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

So how is it then, that our one has turned into a pile of sh*t?

Poorly designed, poorly constructed.

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

All the money in the world cannot stop shit house design work.

So how is it then, that our one has turned into a pile of sh*t?

Poorly designed, poorly constructed.

Someone had an idea that a ferris wheel can be built for that amount of money.

Either make it happen, or we'll find someone else who will.

Perhaps the engineering firm lied about their design or management accepted the risks.

Time will tell...im saying dont be blaming engineering just yet

All the money in the world cannot stop shit house design work.

Structural engineering; If you want something stronger, then keep adding steel and concrete :nyaanyaa:

This equals more money, so I disagree with your statement...

Australia can design a lot of good things, we just dont have the economy to build here. Hence why companies outsource design work to Australia..

and My ki,

Some manager made the call that we can make a system cheaper than just buying one made.

However after the final details came through, thats where the same manager realised he greatly underquoted.

Nothing to do with Engineering in my opinion. Purely money saving driven, instead of opting for a longer payback period with an existing overseas system.

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • So stock ECU does not like anything above 10 psi?  That Nistune one is just for "try" if it will be any different, I know it need to be tune for that. I know but YOU may know about these problem but i/we dont. They few little Skylines here let alone people who know anything about tham so that is why iam asking here  
    • So now we have a radiator with no attachments whatsoever. It lifts up with a particularly tight spot between the drivers side air box mount and the lower radiator outlet, but if you've got this far you will sort that too. This is the lower mounts with the rad out so you can see where the rubber bushes go, it is a straight shot upwards Done! Assembly is the reverse of disassembly, with blood less likely to be shed.
    • Right, onto the second last trick. The Air Con condenser is mounted to the front of the radiator and stays in the car when the radiator is removed. There are 2x 10mm headed self tappers holding the top of the condenser to the radiator, remove those The bottom of the condenser is attached to the radiator with clips. You need to lift the condenser out of those clips and clear (up, then forward). f**ked if  could work out how to do that last bit with the front bumper on. I hope you can, and you share the trick.  Bumper removal probably deserves its own thread one day once I've recovered the will to live, but basically you need to remove the wheels, front inner guard liners (clips and 10mm headed bolts), the self tapper between the guard and the bumper at the rearmost point of the bumper (same as an R32 that bit), any remaining clips at the top/front of the grill, an absolute bastard design with a plate that holds the top of the bumper above the headlight each side (only 1 bolt which is tricky to get to, but the plate catches 2 places on the bumper and must be removed....carefully!) and push clips between the bumper and guard under the headlight. If you've done all that you will be faced with wiring for the fog lights on both sides and in ADM Q50 RS at least, 4 nasty tight plugs on the driver's side for the ADAS stuff. So, the clips at the bottom look like this on drivers side (looking from the front) And on the passenger side (also from the front), you can see this one is already out Clearance on both of these are super tight; the condenser needs to move up but the upper rad support mount prevents that, and the radiator can't move down far because it is (rubber) mounted. Once you achieve the impossible and drop the condenser off those mounts so it does not stop the rad moving, you are good to go
    • OK, next the shroud needs to come off and there are a couple of tricks. Firstly, there is a loom from near the passenger side headlight to the fans, coolant temp sensor etc and there is no plug to undo.  In my case I was OK to leave the shroud on top of the engine so I just undid the passenger side fan plug and about 10 of the clips which gave enough free wire to put it aside. The fan plugs were super tight, the trick I used was a small falt screwdriver to push down on the release tab, then a larger flat screwdriver to lever the plug out of the fan unit....be careful with how much force you apply! If you need to remove the shroud altogether for some reason you will have to deal with all the plugs (tight) and clips (brittle)....good luck. I removed all of the clips and replaced them with cable ties that I will just cut next time. Also, in the Red Sport / 400R at least, the intake heat exchanger reservoir hose is bolted to the shroud in 2 places with 10mm headed bolts; so remove them (the hose stays in the car; no need to undo it at the t fittings down at the radiator lower mount. Once you've dealt with the HX hose and the wiring loom, there are 3x 10mm headed self tappers holding the top of the shroud to the radiator; remove those.   The shroud then lifts out of the bottom mounts where it sits on the radiator, up and onto the engine out of the way. Simples
    • Ok, disregard my “rate them” comment, sorry for my unrealistic input
×
×
  • Create New...