The engineering department would build/design to whatever budget is given to them however it's their responsibility to flag any risks. It's up to the project manager/directors to accept this risk.

Exactly.

And either they did... And then it is ING's management fault.

OR they did not - And they are squarely to blame. If the engineers had a report highlighting the risks etc, it would most likely have been leaked by now. Especially as Work Safe was involved with it all etc etc.

The fact it wasn't leaked or hasn't even been mentioned strongly indicates it was just shitty engineering from the outset... Which is little surprise as that is how things are "done" in recent times because people have NFI what they are doing.

Sorry Pat,

Would have to disagree with you here.

I find it highly unlikely that the engineers built the ferris wheel knowing the risks and that it was due solely to budget. If they knew theithere was a risk in it failing upon being built, I would say that they would have abandoned the project or asked for additional funding.

Moreso that they just stuffed up.

Also their are alot more factors to determine if a project is viable other than payback period. I.e NPV,IRR,and other economic factors such as cash flows, good will and additional interested attracted to the area.

+1

ING would NEVER let a wheel get built that "Will crack in a Melbourne summer" and "It will cost you 4x as much as a result".

It's just retarded. Poor design is certainly the winner here. It's almost sounding like a Gov't project that gets fed to someones "mate" and then costs "blow out unexpectedly"

Sorry Pat,

Would have to disagree with you here.

I find it highly unlikely that the engineers built the ferris wheel knowing the risks and that it was due solely to budget. If they knew theithere was a risk in it failing upon being built, I would say that they would have abandoned the project or asked for additional funding.

Moreso that they just stuffed up.

Also their are alot more factors to determine if a project is viable other than payback period. I.e NPV,IRR,and other economic factors such as cash flows, good will and additional interested attracted to the area.

Yes no doubt there was a stuff up but I wouldnt say its 100% engineers fault. They are contracted/paid to come up with a design that meets the budget of the project. Engineering Dept can show several designs at different costs and risks associated but at the end whoever approved and accepted the risk is at fault.

We dont know.. perhaps at the start of the project they believed the budget was enough to cover. Once you start doing the final design/costing, thats where it adds up and could have blown over budget. With investors promised a return & capital locked, cost would have been cut to squeeze within budget. Most likely the order was given to cut costs, changes were rushed, materials swapped, support beams deleted etc to deliver something which falls close to budget.

If the project manager was guaranteed that it wouldnt fail then I would agree that the Engineering/design team was negligent. If there was a risk, thats where management decide to ask for money or accept the risk...

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

Also well aware of IRR, NPV etc when it comes down to capital investment & approval.

Discussion was not tailored towards Chartered Accountants :cheers:

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

So how is it then, that our one has turned into a pile of sh*t?

Poorly designed, poorly constructed.

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

All the money in the world cannot stop shit house design work.

So how is it then, that our one has turned into a pile of sh*t?

Poorly designed, poorly constructed.

Someone had an idea that a ferris wheel can be built for that amount of money.

Either make it happen, or we'll find someone else who will.

Perhaps the engineering firm lied about their design or management accepted the risks.

Time will tell...im saying dont be blaming engineering just yet

All the money in the world cannot stop shit house design work.

Structural engineering; If you want something stronger, then keep adding steel and concrete :nyaanyaa:

This equals more money, so I disagree with your statement...

Australia can design a lot of good things, we just dont have the economy to build here. Hence why companies outsource design work to Australia..

and My ki,

Some manager made the call that we can make a system cheaper than just buying one made.

However after the final details came through, thats where the same manager realised he greatly underquoted.

Nothing to do with Engineering in my opinion. Purely money saving driven, instead of opting for a longer payback period with an existing overseas system.

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • If you mean the alarm immobiliser; theyre internal to the alarm itself which makes that difficult; I couldnt even see where he put it; its not in the same place as last time; but with all black wiring it might be very challenging to trace  I had someone turn the key for me as I know it only primes for a couple of seconds As my post above; I am getting no voltage to the pump at all; but I am testing continuity of the power line (SB) from the pump plug to the relay fine. As well as the negative from the pump plug to a 12V constant.    Yeah; he blammed the no start on a bad battery; said I needed to get a new battery and it'll start. Turns out the battery drained because the tail lights had been on for half the day during the install (the rubber cushion on the brake switch gave out while he was testing it as I have a picture of the car from that morning with the tail lights off..i've replaced that). The battery was turning over the engine just fine for a long time; but got low since lights were draining it so it was too low to test a start after he finished. I bought a new one on his advice...$250 wasted. My original battery charged up just fine and is healthy.    It was running perfectly fine when I messed up the old alarm (programmed out the remotes). He couldnt start it after removing the old alarm; my assumption is that when he unhooked it; he didnt bridge the circuit back when trying to start it. Its always been perfectly fine. The ECU swap and pump were 2 years ago. It's never missed a beat in that time. 
    • This is a big issue for me without the diff. I just have zero drive from the passenger side when drivers side has no traction. Bec's parents place has a crazy steep driveway with odd camber and I have never been able to get up. My bro-in-law's 130i with an (unknown brand) LSD gets up fine as does their dad's Hiace. My car stays at the bottom. We have other odd camber roads around here as we're elevated a bit and if it's raining I can get totally stuck around some hairpins. 
    • Yeah, I am super excited for this.
    • Was the car running before he touched the car?
×
×
  • Create New...