Yes no doubt there was a stuff up but I wouldnt say its 100% engineers fault. They are contracted/paid to come up with a design that meets the budget of the project. Engineering Dept can show several designs at different costs and risks associated but at the end whoever approved and accepted the risk is at fault.

We dont know.. perhaps at the start of the project they believed the budget was enough to cover. Once you start doing the final design/costing, thats where it adds up and could have blown over budget. With investors promised a return & capital locked, cost would have been cut to squeeze within budget. Most likely the order was given to cut costs, changes were rushed, materials swapped, support beams deleted etc to deliver something which falls close to budget.

If the project manager was guaranteed that it wouldnt fail then I would agree that the Engineering/design team was negligent. If there was a risk, thats where management decide to ask for money or accept the risk...

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

Also well aware of IRR, NPV etc when it comes down to capital investment & approval.

Discussion was not tailored towards Chartered Accountants :cheers:

S'all good Pat. Just some friendly banter. At the end of the day we can only speculate. :cheers:

and My ki,

Some manager made the call that we can make a system cheaper than just buying one made.

However after the final details came through, thats where the same manager realised he greatly underquoted.

Nothing to do with Engineering in my opinion. Purely money saving driven, instead of opting for a longer payback period with an existing overseas system.

Don't even bring Gov't Funded stuff into discussion on private enterprise.

They are two ends of the field.

Myki was NOT done with money saving in mind.

Add to the fact Keane/Kamco is American owned... Yet the other tender was MTR...

I mean MTR have the current fking contract! Why would they give it to Kamco to do the ticketing system when MTR have a tried and proven system.

Gov't projects are always under quoted on purpose to snap the contract and then bump costs during it.

However before myki even went live it was something in the order of 60% OVER BUDGET... Since it's gone live, fck knows, it's probably closer to 100% blowout.

It's just absurd bureaucracy at it's best. Do not confuse this for one second with private enterprise. There is nowhere near the abuse that Gov't stuff endures. I mean they even had to go to a probity audit on the tender FFS.

Yes they "ruled" it was fair, but who knows what was really going on.

Yes cause we've all heard of that obscure artist before.

Edit: have one of his songs tagged in Shazam, dammit.

i highly doubt anyone with regular play on nova could be considered obscure ;)

Dubstep is also terrible

this

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • Ok guys thank you very much. GCG highflow it is then 🙂 
    • forgot to mention that when it does this it does not kill the engine, but I have not kept the pedal down long enough to let it, as I see no reason to beat up on it as its got to be something simple, small and dumb causing this.  And as soon as I let off pedal, the engine returns to its normal super smooth operation and rpms re-stabilize quickly, once below 4k. 
    • neither stumble or cut really seem to be an appropriate term....hard to explain its like a rev limiter but at 4k, but it violently shakes engine and entire vehicle as the rpms will not rise over 4k, even with slow acceleration. as soon as it hits 4k, it sounds like entire spark is lost entirely. plugs were 1.1 which I used as such, but later put in new plugs gapped down to .8 changed back after issue arose when I replaced the coils, still does it with either plug gap...damn and it was all running so good.
    • Oh how times have changed! I actually lean it out relative to my water/methanol injector duty cycle. The methanol adds a lot of fueling and you can then lean it out even more due to reduced knock. 
    • Yeah my thoughts are the same, a well thought out WMI setup, would be slightly ahead of just straight E85 and you're also chemically intercooling the charged air, dropping it even further. This is why you need to add so much more fuel as soon as you spray. I remember someone taking me through their set up before (Dennis, has a R33, lives around Cabramatta - no idea if he's still around on this forum). He would target AFR 10:1 on 98, then as WMI ramped on, AFR would lean back up to 11:1. Amazingly, he did this all through his PowerFC, a relay to cut power to his EBC solenoid if there was not enough line pressure on his WMI kit. And of course, if there wasn't any boost made above gate pressure, you wouldn't be accessing the load cells with heaps of timing for WMI. One downside to that rudimentary setup, once the WMI came on, the EBC would unleash the dragon, and of course all the timing. Tyres would fry lol.
×
×