Jump to content
SAU Community

Recommended Posts

lol i work a cash job though. =x

dodgy student style

Dodgey kent, no entitlements for you then

Construction industry shuts down for Christmas and Easter so that's forced annual leave... 8 days left over after 3 weeks off at Christmas and 10 days at Easter..

Salary sacrifice gets me an additional 2 weeks leave though

Please aware me how salary sacrifice entitles to an extra 2 weeks annual leave?

Rate I'm going I'll send em broke

Ey tony u might know, do they have to pay annual leave at my retainer rate or my average earnings? Cos there is a considerable difference

It would be at your standard hourly rate, so at your retainer rate

Please aware me how salary sacrifice entitles to an extra 2 weeks annual leave

1.x hours is deducted from your pay each week which over a year adds up to 2 weeks annual leave. It's separate from regular leave.

After a year you can sacrifice more and get 4 weeks

Lol your Boss is really unaware

He should be awared.

I prefer to break up my annual leave into a bunch of fridays taken off at random during the year. 3 day weekends throughout ftw. Don't need extended holidays for Christmas.

1.x hours is deducted from your pay each week which over a year adds up to 2 weeks annual leave. It's separate from regular leave.

After a year you can sacrifice more and get 4 weeks

Ah fair enough.

Normally when I deal with salary sacrifice its employees putting additional super or laptops or cars etc....Haven't had a client salary sacrifice to get additional leave yet lol

Edit:

Thinking about it's essentially the same as unpaid leave I.e. You deduct a days pay so I can take a holiday tomorrow with pay or You pay me today and I take an unpaid annual leave day tomorrow

Boo! I rkn it should be the average weekly amount retainer is Fkn bs chicken feed... Fkn kunce. No wonder ppl don't bother with holidays only earn a quarter of normal pay

Negotitate to go on a higher salary and less bonuses before you leave.

Just saved you $20,000 plus

You owe me a GTR

Ah fair enough.

Normally when I deal with salary sacrifice its employees putting additional super or laptops or cars etc....Haven't had a client salary sacrifice to get additional leave yet lol

Edit:

Thinking about it's essentially the same as unpaid leave I.e. You deduct a days pay so I can take a holiday tomorrow with pay or You pay me today and I take an unpaid annual leave day tomorrow

Yeah pretty much just paying for extra time off... They only recently started offering it, so I did it.. My gf couldn't get time off over Christmas which is when we're on a forced 3 week break, which only leaves us with the 8 days leave after christmas/easter industry shut downs.. So the idea was to have that extra leave so I could take time off when she can get it so we can actually go somewhere.

But now it's looking like her boss will give her time off in Jan, so it should work out sweet now...Hopefully take a trip to Thailand...

Once I go second year I might stop doing the salary sacrifice...It gets paid at the rate you earned it at, so if I was to take salary sacrifice annual leave after November when I'm a second year, I'd still get paid at the first year rate...

So my plan is to do what Birds mentioned, take some Fridays and Mondays off to use the salary sacrifice leave...get some 3/4/5 day weekends happening

You'll love it Dezzeye, all jobs should be 4 days a week. Not just a longer weekend but a shorter working week, makes a huge difference to your life and getting shit done.

Yeh and ur income..

It's less pay, but depending what you earn and what you own, you could live comfortably on 4 days a week. Tough to put a price on life and days in your youth that you'll never get back!

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • There's restrictor pills in the stock boost control hoses. That's how they set the amount that was bled off and hence the "high" boost setting. The usual mod in the day was to remove it and send the "high" boost setting up to about 14 psi.
    • Thanks Duncan, that's the best info I've read. Furthermore after learning about the PCM programming side controlling the factory boost solenoid, the purpose of the solenoid is to "bleed" boost when pin 25 is earthed, thus allowing spring pressure in the wastegate actuator to overcome diaphragm boost pressure, thus closing or reducing the position of the wastegate flap creating more boost as the turbo is able to spin faster. It's pretty cool to see a designated Pill to do exactly this, would have liked to have seen it with a tiny filter over the end for those moments in vacuum.  The constant bleed pill has now been removed completely from the system and solenoid boost control has been restored once again.   Case closed 😂
    • The wideband reading is meaningless if it's not running. Why are you using shitty old sidefeeds on any engine, let alone a Neo? What manifold and fuel rail are you using to achieve that? Beyond that, can't help you with AEM stuff as I've never been their ECU/CAS combo.
    • Manual boost controllers (where a little of the boost was bled off) were quite common back in the day, because they were cheap and easy. Generally they had a manual adjustment screw rather than being fixed like yours. Down side is they always bleed boost, not just when you want them to so an electronic boost controller that uses a solenoid will have less lag.
    • Hello , im new here and i have A31 home build  RB25det neo stock eng / turbo  aem ems 2 blue connector  aem 3.5 map aem cas disk aem wideband connected to ecu  355 lph pump 550 nismo yellow injectors side feed aftermarket regulator  and won’t start with base aem tuner basic tune eventually flipped cas 180 degree so it triggers on correct stroke not in exhaust cycle  Now it won’t start Wideband reads 10 and 11 at lowest fuel setting  and will share calibrations soon for aem tuner i think something is wrong in aem tuner    please if you have any information, am very grateful         
×
×
  • Create New...