Jump to content
SAU Community

Recommended Posts

Get in the Tiida and just rock up.

Take the keys off Jimbo and rip a launch up the street.

Wish it was that easy, after I get the OK I have to get the girls looked after and book a flight to Sydney

You are one sick puppy Paul :spank: nice butt :3some:

I don't think so, said it was the first run ??

It is just about impossible to speak to anyone that knows what is going on and only get info second hand ?

Sure will be glad when it is over :)

I am sure they feel the same way :)

I am not the best at reading graphs but next week I will know how it feels when I have my fat arse on the seat and a 350 Klm drive home, going to use the old Highway to give it some work away from the Freeway :)

I hope there is a heap better graph once the final tune is done :/

Hi Mick-o , I asked that question before and I think they said they cannot do it with their Dyno program, I would think you could make the program do what you want it to ??

Needs more boost!!

Good to see it going ( I too cannot understand why some people show mph instead of rpm).

My guess is the final figure will be between 400 and 500 awkw - anywhere in that range should do!

  • Like 1

Needs more boost!!

Good to see it going ( I too cannot understand why some people show mph instead of rpm).

My guess is the final figure will be between 400 and 500 awkw - anywhere in that range should do!

Hi Bob, just want it finished and hopefully give me the responsive results I have worked to get, well paid to get :)

Looking at 400awkw ish on 98 pump. maybe 450 with E85.

Does not matter at this stage, I just want my car back :)

I'd say 5 months is probably ahead of time on a build like this by a professional workshop....

There will be a month or more of a bit of back and forth once delivered to sort any small issues, run in and re-tune etc.

... it's better not to hope for a number on a page, regardless of what the car makes on that dyno on that day on that fuel your allways just a little dissaponted.

... these days I just rock up and go 'it make what it makes'

Cheers

J.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • Hopefully not shockproof. It does crappy things to good synchros.
    • Mark, please add to your shopping list a cask of wine.       For when the Hills Hoist is installed...
    • Cheers for the tips, I'll go with 50 mm around the side, I'm used to digging with hand tools, my prior occupation had me going well with hand tools and there's nothing that a breaker bar and a pair of gloves to protect my delicate hands can't fix, hopefully...  As my time now is free, if it takes a week to excavate that's not a issue
    • That's a pretty big job card assuming you're not planning on any machinery. I hope your dirt/rock ratio is not like ours, hand digging up here is very hard work I use the Mitre 10 in Sloane St or Gehl's Nursery where I can rather than Bunnings, but for bulk material everything (Goulburn Sand and Soil, Rocky Hill Sand and Soil) and is owned by Divalls (as is about 80% of town) so no point shopping around. Let me know if you need to borrow a ute or box trailer. BTW we also went with 7mm blue metal around the house, mostly for fire but also termites. You really need compacted road base under it then no more than about 50mm of rocks because otherwise they shift too much under foot. We also put corten edging to stop it spreading outside its area over time.
×
×
  • Create New...