Yes no doubt there was a stuff up but I wouldnt say its 100% engineers fault. They are contracted/paid to come up with a design that meets the budget of the project. Engineering Dept can show several designs at different costs and risks associated but at the end whoever approved and accepted the risk is at fault.

We dont know.. perhaps at the start of the project they believed the budget was enough to cover. Once you start doing the final design/costing, thats where it adds up and could have blown over budget. With investors promised a return & capital locked, cost would have been cut to squeeze within budget. Most likely the order was given to cut costs, changes were rushed, materials swapped, support beams deleted etc to deliver something which falls close to budget.

If the project manager was guaranteed that it wouldnt fail then I would agree that the Engineering/design team was negligent. If there was a risk, thats where management decide to ask for money or accept the risk...

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

Also well aware of IRR, NPV etc when it comes down to capital investment & approval.

Discussion was not tailored towards Chartered Accountants :cheers:

S'all good Pat. Just some friendly banter. At the end of the day we can only speculate. :cheers:

and My ki,

Some manager made the call that we can make a system cheaper than just buying one made.

However after the final details came through, thats where the same manager realised he greatly underquoted.

Nothing to do with Engineering in my opinion. Purely money saving driven, instead of opting for a longer payback period with an existing overseas system.

Don't even bring Gov't Funded stuff into discussion on private enterprise.

They are two ends of the field.

Myki was NOT done with money saving in mind.

Add to the fact Keane/Kamco is American owned... Yet the other tender was MTR...

I mean MTR have the current fking contract! Why would they give it to Kamco to do the ticketing system when MTR have a tried and proven system.

Gov't projects are always under quoted on purpose to snap the contract and then bump costs during it.

However before myki even went live it was something in the order of 60% OVER BUDGET... Since it's gone live, fck knows, it's probably closer to 100% blowout.

It's just absurd bureaucracy at it's best. Do not confuse this for one second with private enterprise. There is nowhere near the abuse that Gov't stuff endures. I mean they even had to go to a probity audit on the tender FFS.

Yes they "ruled" it was fair, but who knows what was really going on.

Yes cause we've all heard of that obscure artist before.

Edit: have one of his songs tagged in Shazam, dammit.

i highly doubt anyone with regular play on nova could be considered obscure ;)

Dubstep is also terrible

this

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • GCG is a good company, they're a major distributor for Garrett in Japan as well.
    • Nah, OEM washer bottle and brake fluid reservoirs are fine I don't know what it is with the plastic that Mazda used, some plastics, like the washer bottle and brake fluid res are fine, and still look new after 20 years use, where as the coolant expansion tank, and PS reservoir, that I replaced with new OEM items when I first got the car, turned yellow and started getting brittle a few years later If the dirty yellow stained plastics didn't trigger me there wouldn't be an issue, but they did, much like the battery bracket....... Meh As for going back to work full time to support car stuff, nope, why, because I own a Mazda NC MX5, not a Nissan R series Skyline 🤣
    • I've never heard of CJ-motor, so can't advise you on them. I'd just go straight to GCG for a GCG highflow though. Seems no point to use a middleman. I'm somewhat surprised that the price on the CJ site is lower than the GCG retail price. Even though CJ would get a discount of some sort, you would hardly expect them to give up so much margin. Maybe the price is out of date? Having said that "I'd go to GCG"...when I did my highflow, I went to Hypergear. I did this https://hypergearturbos.com/product/rb25dethighflow/#tab-dyno-results with the R34 OP6 450HP profile. With the BB centre (extra $400) and intially with the standard boost actuator, but I eventually got him to send me the high pressure one when I got to the point of being able to actually use it. Ends up costing the same sort of money as the GCG highflow, but this is, of course, the turbo that I KNOW has a shorter length core and so moves the comp cover rearwards. The GCG apparently doesn't do that. My mechanic also swears by the GCG highflow, given that we have another turbo rebuilder who does something essentialy the same as theirs, using Garrett wheels. He says it stands up at really low revs and makes good power. I haven't pushed my HG highflow past ~240-250rwkW yet (should have a little more in it, but unclear how much) and it does have a fairly gentle boost ramp. OK, it's much better now that I have gotten my boost controller tuned up on it.  A lot of my earlier unhappiness was because I couldn't keep the wastegate flap as closed as it needed to be (including some mechanical issues). I'd still prefer it to boost up nearly as quickly as the stocker, and it certainly a bit slower than that. So maybe the GCG one is worth the first look (for you).
    • Ok thanks 🙂 I will higly consider this. Any "known" company for a good reviews and experience to send that off? Is that CJ-motor good one? Or go straight to GCG site? I need to use VPN to even find some of those "shops" let alone access them 🙂 
    • You can literally put in as much WMI as it takes to quench the combustion totally (and then back it off a little, obviously), and it will keep making more and more power. The power comes from the cooling effect of the water (and the meth) and the extra fuel (the meth, which also has massive octane). It is effectively exactly like running E85. One might be slightly better than the other, but they are damn close. But with either you can lean on the boost or the timing (or both) waaaay more than with just petrol and the results are similar. Here's the first thing I googled for an anecdotal bit of evidence. Can't access the attachment without being a gold member, but it is there for the getting if able to, or searched up elsewise perhaps. https://www.hpacademy.com/forum/general-tuning-discussion/show/wmi-vs-e85/
×
×
  • Create New...