Jump to content
SAU Community

Recommended Posts

You forgot one major thing though Al (and I know this is going to be a can'o'worms) but proximity to good public schools.

No f**king way my Kid is going to St Albans high just so I can have a bigger bedroom

Rabble rabble rabble

Do you know how many successful people had their schooling at St Albans high?

How dare you, you ignorant piece of shit

Rabble rabble

/internetwhereyouropinionisalwayswrong

  • Like 1

You forgot one major thing though Al (and I know this is going to be a can'o'worms) but proximity to good public schools.

No f**king way my Kid is going to St Albans high just so I can have a bigger bedroom

LOL

Seabrook primary (public) was / is ranked top 5 in Victoria for a couple of subjects.

Aside from that a number of schools here are well regarded and have better amenities.

But perhaps the $500+ thousand you save on your house can cover a $200k private education

  • Like 1

I doubt Jonoe is turning down grad jobs cause it doesn't fit/low pay/hard work.

If he is, then harden the f**k up.

If he having trouble securing any grad job, he needs to make himself stand out amongst all the others.

And I stand by my comment of grad jobs. They are hired by HR under their budget & have no clue what makes a good engineer. All they can go off is uni marks which is only one dimension of a productive employee.

Best to go for full time job if you can talk the talk as you are hired by senior engineer & not some HR muppet.

f*k no, i have to get interviews for grad positions first. You'd be pretty stupid to turn down grad job these days in engineering. lol. Move around later on, not choose what u wanna do now. Just need that big foot in the door.

I'm gonna try network though my boss atm. Since we are technically a subbie. High exposure to multiple builders. Blah blah blah. I dont have much confidence in those general grad positions/programs. Sure i'm gonna try. But gonna rely more on getting something through the industry. Instead of applying for grad positions.

  • Like 2

f*k no, i have to get interviews for grad positions first. You'd be pretty stupid to turn down grad job these days in engineering. lol. Move around later on, not choose what u wanna do now. Just need that big foot in the door.

I'm gonna try network though my boss atm. Since we are technically a subbie. High exposure to multiple builders. Blah blah blah. I dont have much confidence in those general grad positions/programs. Sure i'm gonna try. But gonna rely more on getting something through the industry. Instead of applying for grad positions.

Yeah that's how it is in the engineering world.

I've had multiple eng grads reporting to me picked by HR department/budget. All they have is high uni marks & 0 world experience/people skills.

Better to push for industry/position rather than a grad program position but it doesn't hurt to apply for both.

Deets on this

- Forget about looking for bargains/trying to save a sneaky $5-10k for your budget. The longer you try to play games, the more chances someone with more money will show up. Commit to your budget, don't go over or be cheap by holding back.

- take a copy of contract after inspection, allows you to send through a written offer via email on the same day rather than waiting until Monday AM. Helps you get ahead of the interested parties.

- watch out for clauses in the contract, one contract wanted me to accept tenants which are being taken to VCAT by vendor. That's not my problem.

- Set a deadline Monday 5pm & don't settle for any later. Agents will scramble to find another interested party prior to deadline if you put forward an offer they can't risk losing. Being straight after the weekend inspection majority will be caught out.

- also if they reject your written offer & take the risk, the auction will have to start from your figure (as far as I'm aware). Which would drive a lot of people away as they can't under quote to lure people in.

- real estate agent wanted me to put in a written offer 10k less than what I initially said & to hold an auction on Tuesday. Although that could mean $10k less payment, it means he can lure in other buyers and create a mini auction. Told him this is my budget & im not playing any games, if someone offers $1 extra by 5pm Monday they can have it.

- what also helped was that it was an unlisted property soon to be put on market. Real estate agent wanted to gauge market interest prior to advertising. Dropped an offer for a price I knew it would go for before the public even knew it was on the market. He did have some interested parties but they wanted another inspection on Thursday. My deadline 5pm Monday put a stop to that.

No doubt my opinion is wrong & could have saved blah blah doing x,y,z. End of day, I'm happy with the result & the realestate ain't. :)

  • Like 1

I shoot targets

They make less mess than animals

Yeah I dont see the point in shooting harmless animals...unless they are in plague proportions /costing you money/dangerous to your well being. Leave the poor animals alone.. You are no hero for shooting one, wanna be a hero, go take it down with your bare hands... If it has teeth or claws you can take a knife...

Cleaning up the tool kit atm, as it's driving me nuts finding things.

other than a pouch any-one seen some smart ways to store spanners?

kit is my track kit so gets bounced around so non slip or thin plastic trays just not last.

Its a Nissan ...you need a 10/12/14/17. Pretty much covers everything, how hard can it be to store 4 spanners...throw a shifter in for good luck
Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • Yeah, that's fine**. But the numbers you came up with are just wrong. Try it for yourself. Put in any voltage from the possible range and see what result you get. You get nonsense. ** When I say "fine", I mean, it's still shit. The very simple linear formula (slope & intercept) is shit for a sensor with a non-linear response. This is the curve, from your data above. Look at the CURVE! It's only really linear between about 30 and 90 °C. And if you used only that range to define a curve, it would be great. But you would go more and more wrong as you went to higher temps. And that is why the slope & intercept found when you use 50 and 150 as the end points is so bad halfway between those points. The real curve is a long way below the linear curve which just zips straight between the end points, like this one. You could probably use the same slope and a lower intercept, to move that straight line down, and spread the error out. But you would 5-10°C off in a lot of places. You'd need to say what temperature range you really wanted to be most right - say, 100 to 130, and plop the line closest to teh real curve in that region, which would make it quite wrong down at the lower temperatures. Let me just say that HPTuners are not being realistic in only allowing for a simple linear curve. 
    • I feel I should re-iterate. The above picture is the only option available in the software and the blurb from HP Tuners I quoted earlier is the only way to add data to it and that's the description they offer as to how to figure it out. The only fields available is the blank box after (Input/ ) and the box right before = Output. Those are the only numbers that can be entered.
    • No, your formula is arse backwards. Mine is totally different to yours, and is the one I said was bang on at 50 and 150. I'll put your data into Excel (actually it already is, chart it and fit a linear fit to it, aiming to make it evenly wrong across the whole span. But not now. Other things to do first.
    • God damnit. The only option I actually have in the software is the one that is screenshotted. I am glad that I at least got it right... for those two points. Would it actually change anything if I chose/used 80C and 120C as the two points instead? My brain wants to imagine the formula put into HPtuners would be the same equation, otherwise none of this makes sense to me, unless: 1) The formula you put into VCM Scanner/HPTuners is always linear 2) The two points/input pairs are only arbitrary to choose (as the documentation implies) IF the actual scaling of the sensor is linear. then 3) If the scaling is not linear, the two points you choose matter a great deal, because the formula will draw a line between those two points only.
    • Nah, that is hella wrong. If I do a simple linear between 150°C (0.407v) and 50°C (2.98v) I get the formula Temperature = -38.8651*voltage + 165.8181 It is perfectly correct at 50 and 150, but it is as much as 20° out in the region of 110°C, because the actual data is significantly non-linear there. It is no more than 4° out down at the lowest temperatures, but is is seriously shit almost everywhere. I cannot believe that the instruction is to do a 2 point linear fit. I would say the method I used previously would have to be better.
×
×
  • Create New...