Yes no doubt there was a stuff up but I wouldnt say its 100% engineers fault. They are contracted/paid to come up with a design that meets the budget of the project. Engineering Dept can show several designs at different costs and risks associated but at the end whoever approved and accepted the risk is at fault.

We dont know.. perhaps at the start of the project they believed the budget was enough to cover. Once you start doing the final design/costing, thats where it adds up and could have blown over budget. With investors promised a return & capital locked, cost would have been cut to squeeze within budget. Most likely the order was given to cut costs, changes were rushed, materials swapped, support beams deleted etc to deliver something which falls close to budget.

If the project manager was guaranteed that it wouldnt fail then I would agree that the Engineering/design team was negligent. If there was a risk, thats where management decide to ask for money or accept the risk...

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

Also well aware of IRR, NPV etc when it comes down to capital investment & approval.

Discussion was not tailored towards Chartered Accountants :cheers:

S'all good Pat. Just some friendly banter. At the end of the day we can only speculate. :cheers:

and My ki,

Some manager made the call that we can make a system cheaper than just buying one made.

However after the final details came through, thats where the same manager realised he greatly underquoted.

Nothing to do with Engineering in my opinion. Purely money saving driven, instead of opting for a longer payback period with an existing overseas system.

Don't even bring Gov't Funded stuff into discussion on private enterprise.

They are two ends of the field.

Myki was NOT done with money saving in mind.

Add to the fact Keane/Kamco is American owned... Yet the other tender was MTR...

I mean MTR have the current fking contract! Why would they give it to Kamco to do the ticketing system when MTR have a tried and proven system.

Gov't projects are always under quoted on purpose to snap the contract and then bump costs during it.

However before myki even went live it was something in the order of 60% OVER BUDGET... Since it's gone live, fck knows, it's probably closer to 100% blowout.

It's just absurd bureaucracy at it's best. Do not confuse this for one second with private enterprise. There is nowhere near the abuse that Gov't stuff endures. I mean they even had to go to a probity audit on the tender FFS.

Yes they "ruled" it was fair, but who knows what was really going on.

Yes cause we've all heard of that obscure artist before.

Edit: have one of his songs tagged in Shazam, dammit.

i highly doubt anyone with regular play on nova could be considered obscure ;)

Dubstep is also terrible

this

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • Starter motors used to use the weight of metal (magnets) to provide torque. Now they use (more) current instead. This. It's completely normal.
    • So thing that had me stumped, but I think is OK....is that when it was up in the air, in neutral I had it running to bleed to coolant while I put the wheels back on. I noticed the rears were turning (slowly) which I'd never seen before 20250928_163512.mp4     Because there had been an issue with clutch slip due to pedal adjustment on the dyno, I assumed there was still and issue so spent some quality time upside down under the dash adjusting the pedal....but no matter what I did the wheels still turned in neutral. Even disconnected the master cylinder to pedal rod and same. In despair, I even removed the clutch slave so there was no chance of any preload causing it.....still happened. So either: 1. Something is not right in the bellhousing, or 2. Its a thing sometimes with cold, thick gearbox oil Internet says it might be 2, I hope so!
    • OK, few more things sorted and it is ready for a shakedown on 10-Oct, with one weird thing. Changed the run in oil and filter for the good stuff. 8l came out, about 8.5 went in with filter so that looks all good. Changed the starter (again), this time for a brand new one, works good. Interesting that the Taaaarks one is shorter than factory but spins harder, I guess electronics have moved on a little in the last 30 years. Will be nice to have a bit of extra space under there. Put the timing cover back on, and noted where the cam gears were set as a record.  Will need to double check the timing but it is pretty close. Also put the coil pack cover and intake snorkel back on. Exhaust Inlet Changed the water out for coolant, bled up nicely. Removed the rear brake pads (well worn factory sumitomo ones!), gave the hardware a good clean and reassembled. I've put bendix XP on the back again because the price is excellent at $150 a set and they worked well on the V37. Front pads have plenty so no issue there
    • Mine is all -12, I’m running a dry sump in a billet block though 
×
×
  • Create New...